119303 results found. results are sorted by relevance
  201-225
https://grouper.ieee.org/groups/802/15/pub/2004/15-04-0006-00-mmwi-introduction-vertically-connected-wireless-system.pdf
Microsoft PowerPoint - 15-04-0006-00-mmwi-Introduction of vertically connected wireless system.ppt January,2004 Ami Kanazawa, CRLSlide 1 doc.: IEEE 802.15-04/0006r0 Submission Project: IEEE P802.15 Wo
https://grouper.ieee.org/groups/1788/email/msg08130.html
Re: textToIntevsal(s) and exceptions Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: textToIntevsal(s) and exceptions To : Dmitry Nadezhin < dmitry.nade
https://grouper.ieee.org/groups/802/11/email/stds-802-11-tgbe/msg04164.html
Re: [STDS-802-11-TGBE] TGbe Teleconferences [01/20/2021 AND 01/21/2020]: Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: [STDS-802-11-TGBE] TGbe Telecon
https://grouper.ieee.org/groups/802/3/bladesg/email/msg00016.html
AW: [bp] BER Objective for BPE Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index AW: [bp] BER Objective for BPE To : IEEE@xxxxxxxxx , ahealey@xxxxxxxxx , stds
https://grouper.ieee.org/groups/802/3/10GBT/email/msg00159.html
RE: [10GBT-Modeling] RE: [10GBT-Cabling] [10GBASE-T] a channel ca pacit Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index RE: [10GBT-Modeling] RE: [10GBT-Cabl
https://grouper.ieee.org/rac/private/email/msg02868.html
Re: RAC FEEDBACK REQUESTED BEFORE MAY 17: Regarding customer request for Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: RAC FEEDBACK REQUESTED BEFORE M
https://grouper.ieee.org/groups/802/3/af/public/sep00/muir_2_0900.pdf
Diode Discovery Process Economic Feasibility 1 Robert Muir IEEE 0900 D T E p ow er o ve r M D I Diode Discovery Process Economic Feasibility Robert Muir -Intel Acknowledgments: Karl Nakamura, Rick Bro
https://grouper.ieee.org/groups/802/secmail/msg18780.html
Re: [802SEC] +++ 10-day EC Email Ballot +++ Approval of Liaison to 3GPP Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: [802SEC] +++ 10-day EC Email Bal
https://grouper.ieee.org/groups/802/secmail/msg26425.html
Re: [802SEC] F2F meeting safety Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: [802SEC] F2F meeting safety To : STDS-802-SEC@LISTSERV.IEEE.ORG Subject
https://grouper.ieee.org/groups/802/11/Documents/DocumentArchives/1999_docs/901917a7A-slides-for%20Improved%20Rate%20Signalling.pdf
901917a7A-slides-for Improved Rate Signalling.PDF January 1999 doc.: IEEE 802.11-99/019a Submission page 1 Tal Kaitz and Naftali Chayat, BreezeCOM IEEE P802.11 Wireless LANs An Improved Rate Signallin
https://grouper.ieee.org/groups/802/11/email/stds-802-11-tgbe/msg08962.html
[STDS-802-11-TGBE] 答复: [STDS-802-11-TGBE] TGbe Announcement: Berlin MAC Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index [STDS-802-11-TGBE] 答复: [STDS-802-11-
https://grouper.ieee.org/groups/802/3/10G_study/email/msg02641.html
RE: 20 ppm clock tolerance for WIS Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index RE: 20 ppm clock tolerance for WIS To : stds-802-3-hssg@xxxxxxxx , "'Davi
https://grouper.ieee.org/groups/802/3/efm/public/email/msg01872.html
[EFM] Re: [EFM-OAM] New update on EFM OAM Work Item #3 Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index [EFM] Re: [EFM-OAM] New update on EFM OAM Work Item #
https://grouper.ieee.org/groups/802/11/email/stds-802-11-tgbe/msg05895.html
Re: [STDS-802-11-TGBE] 答复: [STDS-802-11-TGBE] Guidelines for Comment Ass Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: [STDS-802-11-TGBE] 答复: [STDS-80
https://grouper.ieee.org/groups/802/3/hssg/email/msg01592.html
Re: [802.3BA] XLAUI / CAUI Ad Hoc Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: [802.3BA] XLAUI / CAUI Ad Hoc To : STDS-802-3-HSSG@xxxxxxxxxxxxxxxxx S
https://grouper.ieee.org/groups/802/20/Contribs/C802.20-04-68r1.doc
Project Project IEEE 802.20 Working Group on Mobile Broadband Wireless Access < http://grouper.ieee.org/groups/802/20/ > Title Evaluation of 802.20 proposals with adjacent channel interference conside
https://grouper.ieee.org/groups/1788/email/msg07803.html
Re: the final text - bib Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: the final text - bib To : < ulrich.kulisch@xxxxxxx > Subject : Re: the final te
https://grouper.ieee.org/groups/802/secmail/msg25621.html
Re: [802SEC] +++Early Close 10-day EC Motion +++ Change Date of IEEE 802 Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: [802SEC] +++Early Close 10-day
https://grouper.ieee.org/groups/802/18/Meeting_documents/2002_Sept/18-02-028r1f_ExParte_re_AMSAT.pdf
18-02-028r1f_ExParte_re_AMSAT.PDF Ex Parte Comments on AMSAT Reply Comments in ET Docket No. 02-98 IEEE 802.18 RR-TAG October 9, 2002 IEEE 802 Charter • Develop standards for computer networks – Wired
https://grouper.ieee.org/groups/802/16/meetings/mtg22/report.html
802.16 Session #22 Report IEEE 802.16 Session #22 Report Summary Session #22 of the IEEE 802.16 Working Group on Broadband Wireless Access took place on 11-14 November 2002 at the Hyatt Regency Kauai
https://grouper.ieee.org/groups/802/mbwa/email/msg00275.html
RE: stds-802-18 FW: 802.18 input contributions on UWB Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index RE: stds-802-18 FW: 802.18 input contrib
https://grouper.ieee.org/groups/802/3/ck/public/19_11/sun_3ck_01b_1119.pdf
Baseline Proposal for 100GAUI-1/200GAUI-2/400GAUI-4 C2M Baseline Proposal for 100GAUI-1/200GAUI-2/400GAUI-4 C2M Reference Receiver Mike Li, Intel Jane Lim, Cisco Junqing (Phil) Sun, Credo Rich Mellitz
https://grouper.ieee.org/groups/802/3/bz/public/nov15/Farjadrad_3bz_01a_1115.pdf
25GBASE-T Technical Feasibility and Power Page 1IEEE 802.3bz 2.5G/5GBASE-T – May 2015 Pittsburg USA Ramin Farjadrad Aquantia Corp. 2.5G/5.0G Transmit Linearity Test with Link-Partner Signal as Disturb
https://grouper.ieee.org/groups/802/15/pub/802.15%20Archives/802.15%20Archive%20pre-802WWW/2002/Mar02/02101r7P802-15_TG4%20-%20Draft%20Standard%20-%20Summary%20of%20Open%20Comments%20as%20of%2003-07-02%20-%20Clause%205%20ONLY.PDF
Summary P802.15.4, Draft 13 Summary Report # 13 The introductory list uses a non standard format. The Editor should refer to the IEEE Standards Style Manual. A WE // # 14 Gifford, IanGlobal EDITCl 05
https://grouper.ieee.org/groups/1788/email/msg04260.html
Re: Reasons (not) to vote Motion 27: NO Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: Reasons (not) to vote Motion 27: NO To : 1788 < stds-1788@xxxxxx