Re: [10GBASE-CX4] comments on latest CX4 revision Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: [10GBASE-CX4] comments on latest CX4 revision To : "Dr
Re: [802.3BA] baseline selection deadline Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: [802.3BA] baseline selection deadline To : STDS-802-3-HSSG@xxx
Re: [STDS-802-3-25G] Survey Monkey Straw Poll for 25Gb/s Twin Ax objecti Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: [STDS-802-3-25G] Survey Monkey
Re: [STDS-802-11] Bangkok 802 Wireless Interim Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: [STDS-802-11] Bangkok 802 Wireless Interim To : STDS-802-
PowerPoint 프레젠테이션 IEEE P802.3ca 100G-EPON Task Force May 23-27, 2016 Whistler, Canada Considerations for Recovering Frame Sequence on MPCP+ Kyeong-hwan Doo, and Hwan Seok Chung May 2016 IEEE 802.3 Int
[802.3_100GEL] Announcing Comment Resolution Meetings Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index [802.3_100GEL] Announcing Comment Resolution Meetings
Re: [STDS-802-11-TGBE] TGbe Teleconference [08/29/2019]: Reminder Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: [STDS-802-11-TGBE] TGbe Teleconference
Re: [STDS-802-11-CAC] Input please - additional requested timeslots for Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: [STDS-802-11-CAC] Input please -
stds-802-16: +++ Call for Comments on Editor's Draft Consolidation of IE Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index stds-802-16: +++ Call for Comments
[STDS-802-11-TGBE] PoC assignment as of the end of Tuesday AM2 Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index [STDS-802-11-TGBE] PoC assignment as of the e
Re: [STDS-802-11-TGBI] Reminder about TGbi Teleconference Thursday 10amE Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: [STDS-802-11-TGBI] Reminder abo
Microsoft PowerPoint - thaler_1_0904.ppt Pat Thaler September 2004 Improving Auto-Negotiation Efficiency Next Page Extension AN Page Extension September 2004 Page 2 Problem Statement Clause 28 auto-ne
Breakout Functionality Breakout Functionality John D’Ambrosia, Dell “Applications” Ad Hoc IEEE 802.3 400 Gb/s Ethernet Study Group October 30, 2013 40 GbE is Taking off in the Data Center… 2 1995 2000
Re: Open Ethertype Issues - Response and/or feedback requested by Januar Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: Open Ethertype Issues - Respons
Microsoft PowerPoint - 802.3at-Test Procedure-DC current-11-6-05 802.3at Task Force Test Procedure: 802.3at DC current Operating Limits Chris Di Minico MC Communications cdiminico@ieee.org 802.3at Tas
Microsoft Word - 22-05-0088-00-0000_5C_for_Part74_PAR.doc November 2005 doc.: IEEE 802.22-05/0088r0 Submission page 1 Carl R. Stevenson, WK3C Wireless LLC IEEE P802.22 Wireless RANs DRAFT 5 Criteria f
Re: [802.3_NGEPON] 802.3ca (100G-EPON) bi-weekly consensus call - 02/18/ Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: [802.3_NGEPON] 802.3ca (100G-EP
Re: [STDS-802-11-TGBF] [EXT] TGbf meeting on January 18, 19, 21, 24, 9:0 Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: [STDS-802-11-TGBF] [EXT] TGbf m
IEEE 802.3 PARs Ad Hoc 802.3 PARs ad hoc report IEEE 802.3 ad hoc on PARs from other WGs Robert M. Grow, ad hoc chair RMG Consulting San Diego, CA, USA 10 July 2018 1IEEE 802.3 WG PAR ad hoc, July 201
[802.3_SPEP2P] Major tradeshow announcement of Industrial Automation spe Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index [802.3_SPEP2P] Major tradeshow anno
Re: [802SEC] RESULTS: +++ 10-day EC Email Ballot +++ Confirmation of Mee Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: [802SEC] RESULTS: +++ 10-day EC
Microsoft Word - minutes_040616_25G_50G_NGOATH_ad-hoc_start.docx 1 P802.3by 25 Gb/s Ethernet Task Force and 50G/100G/200G Study Groups Joint Ad Hoc meeting – April 6, 2016
RE: [STDS-802-21] Comments on 21-12-0067-01-srho-tgc-proposal Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index RE: [STDS-802-21] Comments on 21-12-0067-01-sr