IEEE 802.11 Annexes A. Annex - Protocol Implementation Conformance Statement (PICS) Proforma (normative) A.1 Introduction The supplier of a protocol implementation that is claimed to conform to IEEE S
Untitled Document 14 July, 2004 IEEE - 04/297r1 John C. Sarallo - Appairent Technologies al g ect ein. y Submission Page 1 IEEE P802.15 Wireless Personal Area Networks Project IEEE P802.15 Working Gro
Untitled Document 09 July, 2004 IEEE - 04/297r0 John C. Sarallo - Appairent Technologies al g ect ein. y Submission Page 1 IEEE P802.15 Wireless Personal Area Networks Project IEEE P802.15 Working Gro
D2.0 Clause 52 comments resolutions P802.3ae Draft 2.0 Comments # 890Cl 52 SC P L Comment Type T For the 1550 nm PMD a dispersion penalty measurement for the transmitter is needed in order to ensure t
Untitled Document 15 July, 2004 IEEE - 04/297r2 John C. Sarallo - Appairent Technologies al g ect ein. y Submission Page 1 IEEE P802.15 Wireless Personal Area Networks Project IEEE P802.15 Working Gro
IEEE P802.3bt D3.3 4-Pair Power over Ethernet 3rd Sponsor recirculation ballot comments Proposed Response # r03-1Cl 0 SC 0 P L Comment Type E The base_year variable appears to be set correctly as 201x
IEEE P802.3ca D2.0 25/50G-EPON Task Force Initial Working Group ballot commentsProposed Responses # 275Cl FM SC P1 L27 Comment Type ER 802.3cd is published. On page 10 the description of what this ame
IEEE P802.3bz D1.1 2.5G/5GBASE-T 2nd Task Force review comments # 100Cl 00 SC 0 P 1 L 1 Comment Type E Please provide the option of using the new comment spreadsheet at the URL
IEEE P802.20/D0.1m, April 11, 2006 C802.20-09/02r1 1 625k-MC OA & M Radio Network Quality Monitor and Control Enhancement This Chapter is an added to the baseline specification HC-SDMA [25]. 625k-MC n
IEEE P802.3bz D1.1 2.5G/5GBASE-T 2nd Task Force review comments Response # 1Cl 126 SC 126.7.2 P 167 L 25 Comment Type T There are factors of 4 in equations 126-10, 126-11, 126-21, 126-22, 126-24, 126-
IEEE 802.3by D3.0 25 Gb/s Ethernet Initial Sponsor ballot comments Proposed Response # i-1Cl 111 SC 111.9 P 176 L 37 Comment Type E In the last paragraph, "92.9.3" seems to be typo. SuggestedRemedy Ch
Rpr15May2001.PDF 802.17 presentation Prepared for Orlando, May2001 Dr. David V. James Chief Architect Lara Networks 110 Nortech Parkway San Jose, CA 95134 +1.408.942.2010 dvj@alum.mit.edu Basic issues
IEEE P802.3bt D3.3 4-Pair Power over Ethernet 3rd Sponsor recirculation ballot comments r03-1Cl 00 SC 0 P L Comment Type E The base_year variable appears to be set correctly as 201x in the front matte
IEEE P802.3bt D3.3 4-Pair Power over Ethernet 3rd Sponsor recirculation ballot comments r03-1Cl 0 SC 0 P L Comment Type E The base_year variable appears to be set correctly as 201x in the front matter
IEEE P802.3bt D2.2 4-Pair PoE 2nd Working Group recirculation ballot comments Proposed Response # 1Cl 33 SC 33.2.8.5 P 122 L 25 Comment Type TR Section 33.2.8.5 can be reordered to be much more clear.
IEEE P802.3bt D2.2 4-Pair PoE 2nd Working Group recirculation ballot comments 3Cl FM SC FM P 1 L 25 Comment Type E The amendment purpose and ballot stage has disappeared. SuggestedRemedy Change "This
MainTable IEEE P802.3aq D3.1 Ethernet Comments Response # 1Cl 00 SC 0 P 0 L 0 Comment Type GR At the time of submission to the IEEE-SASB, or just prior to publication, you will need to supply email ad
IEEE P802.3cv D0p1 4-Pair PoE Maintenance 1st Task Force review comments Response # 1Cl 33 SC 33.6.3.3 P 75 L 4 Comment Type T IEEE Std 802.3bt-2018 made changes to Clause 79 that deleted Equation (79
MainTable IEEE P802.3cm D3.0 400 Gb/s over Multimode Fiber Initial Sponsor ballot comments Response # i-1Cl 138 SC 138.7.2 P 38 L 34 Comment Type T Note (a) states a normative requirement ("shall" is