119116 results found. results are sorted by relevance
  201-225
https://grouper.ieee.org/groups/802/24/email/pdfq08lLh2moC.pdf
Page 1 of 6 IEEE 802 Plenary Session November 2-7, 2014 San Antonio, Texas USA 6PM Pacific Time October 24 Standard Registration and Cancellation Deadline Tuesday October 21, 2014 November 2014 IEEE-8
https://grouper.ieee.org/groups/802/3/NGBASET/email/msg00655.html
[802.3_NGBASET] FW: 802-0715-July Plenary Session Standard Registration Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index [802.3_NGBASET] FW: 802-0715-July Pl
https://grouper.ieee.org/groups/802/3/hssg/email/msg01388.html
Re: [802.3BA] 802.3ba XR ad hoc next step concern Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: [802.3BA] 802.3ba XR ad hoc next step concern To : STD
https://grouper.ieee.org/groups/802/secmail/msg03859.html
RE: [802SEC] +++SEC MOTION+++ Motion: Authorize Forwarding of the 802.11 Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index RE: [802SEC] +++SEC MOTION+++ Motio
https://grouper.ieee.org/groups/802/21/email21/msg03867.html
FWd: 802-July 2014 Plenary Session-Sa​n Diego-Earl​y Registrati​on Deadl Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index FWd: 802-July 2014 Plenary Session-
https://grouper.ieee.org/groups/802/11/Documents/DocumentArchives/1995_docs/1195227-12r1_scan.pdf
, OV.. her 1995 doc.: IEEE P802.11-95/22~ 2R~ Section 12 comments and responses from Ballot on Draft Standard D2 (Mike Trompower, DS PHY Editor, Aironet) 1 12.1 MRo e Second sentence, replace period w
https://grouper.ieee.org/groups/802/secmail/msg10166.html
Re: [802SEC] Motion re: nNA venues for 2011 and 2012 Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: [802SEC] Motion re: nNA venues for 2011 and 2012 To
https://grouper.ieee.org/groups/802/3/1PPODL/email/pdfmVzRafL7Bv.pdf
Page 1 of 6 IEEE 802 Plenary Session November 2-7, 2014 San Antonio, Texas USA 6PM Pacific Time October 24 Standard Registration and Cancellation Deadline Tuesday October 21, 2014 November 2014 IEEE-8
https://grouper.ieee.org/groups/802/17/documents/presentations/sep2002/minutes_100302_d01.pdf
Microsoft Word - minutes_100302_d01.doc September 30th, 2002 8:30AM Presentation by Mike T Logistics for connection server address 192.168.0.3 192.168.0.3/index.htm 8:54 AM Approval of agenda, F: Bo
https://grouper.ieee.org/groups/802/secmail/msg10878.html
Re: [802SEC] need UC-EC second for Motion to return 802.20 to individual Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: [802SEC] need UC-EC second for
https://grouper.ieee.org/groups/802/20/WG_Docs/802.20-08-19r1.pdf
Microsoft Word - IEEESTD-802.20.3-c.doc IEEE 802.20/08-19r1 IEEE P802.20.3/D1.0, November 2008 Copyright © IEEE. All rights reserved. This is an unapproved IEEE Standards Draft, subject to chan
https://grouper.ieee.org/groups/802/PNP/approved/IEEE_802_WG_PandP_v16.odt
2 1 March IEEE 802 LAN/MAN STANDARDS COMMITTEE (LMSC) WORKING GROUP (WG) POLICIES AND PROCEDURES (P&P) As approved 18 July 2014 Last edited July 18, 2014 Table of Contents 1. Preface 4 2. Modification
https://grouper.ieee.org/groups/802/PNP/approved/IEEE_802_WG_PandP_v16.pdf
IEEE 802 LMSC Working Group Policies and Procedures IEEE 802 LAN/MAN STANDARDS COMMITTEE (LMSC) WORKING GROUP (WG) POLICIES AND PROCEDURES (P&P) As approved 21 March 2014 Last edited July 18, 2014 Tab
https://grouper.ieee.org/groups/1788/email/pdfmPSi1DgZZf.pdf
IEEE.dvi IEEE 754 Error Handling and Programming Languages Nick Maclaren March 2000 IEEE 754-1985 introduced order to a particularly chaotic area and, in general, it has been very successful, though e
https://grouper.ieee.org/groups/802/PNP/approved/IEEE_802_WG_PandP_v16_with_changes.pdf
IEEE 802 LMSC Working Group Policies and Procedures IEEE 802 LAN/MAN STANDARDS COMMITTEE (LMSC) WORKING GROUP (WG) POLICIES AND PROCEDURES (P&P) As approved 21 March 2014 Last edited July 18, 2014 Tab
https://grouper.ieee.org/groups/802/PNP/2014-11/IEEE_802_WG_PandP_v17.doc
IEEE SA Policies and Procedures for: IEEE 802 Working Groups and Technical Advisory Groups Date of Approval: to be filled in by Sponsor or SCC 3 1.0 Introduction 3 1.1 Role of Standards Development 3
https://grouper.ieee.org/groups/802/16/le/docs/80216h-05_017.pdf
Working Document for P802.16h 2005-08-15 IEEE 802.16h-05/017 i Copyright © 2005 IEEE. All rights reserved. This is an unapproved IEEE Standards Draft, subject to change. 1 2 Draft IEEE Standard for 3
https://grouper.ieee.org/groups/802/11/Documents/DocumentArchives/1996_docs/6018066.DOC
IEEE 802.11/D2 Letter Ballot Response Section 6 comments from Ballot on Draft Standard D2 (Vic Hayes, Chair, AT&T WCND) Seq. #Section numberyour initialsCmnt type E, e, T, tPart of NO voteCorrected Te
https://grouper.ieee.org/rac/private/email/pdf00015.pdf
E P1451 September 28, 2003 IEEE P1451.4/D2.05 Copyright © 2003 IEEE. All rights reserved. This is an unapproved IEEE Standards Draft, subject to change. 1 IEEE P1451.4/2.05 Draft Standard for A Smart
https://grouper.ieee.org/rac/private/email/pdf00014.pdf
E P1451 September 28, 2003 IEEE P1451.4/D2.05 Copyright © 2003 IEEE. All rights reserved. This is an unapproved IEEE Standards Draft, subject to change. 1 IEEE P1451.4/2.05 Draft Standard for A Smart
https://grouper.ieee.org/rac/private/email/pdf00016.pdf
E P1451 September 28, 2003 IEEE P1451.4/D2.05 Copyright © 2003 IEEE. All rights reserved. This is an unapproved IEEE Standards Draft, subject to change. 1 IEEE P1451.4/2.05 Draft Standard for A Smart
https://grouper.ieee.org/groups/802/secmail/pdfPUXmqX0_Bq.pdf
IEEE 802.3™ Industry Connections Feasibilty Assessment for the Next Generation of EPON IEEE 802.3 Industry Connections Feasibility Assessment for the Next Generation of EPON DRAFT 3.0, March 2015 1 Co
https://grouper.ieee.org/groups/802/secmail/bin00140.bin
Draft_LMSC_P&P_-_November_2003_R0.doc IEEE PROJECT 802 LAN MAN STANDARDS COMMITTEE (LMSC) POLICIES AND PROCEDURES (Formerly known as OPERATING RULES OF IEEE PROJECT 802 LMSC) Revised effective Novembe
https://grouper.ieee.org/groups/802/3/eee_study/email/pdfoAptcuN95B.pdf
802.3ae Co m m en t c ou nt Clause number 0 5 10 15 20 25 30 35 00 14 22 24 25 35 40 45 46 47 48 49 51 55 69 70 71 72 74 78 79 Count of Comment ER G GR T TR CommentType: ResponseStatus: CommentStatus:
https://grouper.ieee.org/groups/802/3/bp/public/may15/tu_3bp_05_0515.pdf
tu_3bp_05_0515.xlsx Figure 97-2 Change "rem_rcvr_status" to "rem_rcvr_status / rem_data_ready" Figure 97-3 Add PMA_REMDATAREADY from PCS to PMA Add PMA_LOCDATAREADY from PMA to PCS Figure 97-4 Change