MainTable D2.2 Physical Layer Specifications and Management Parameters for 2.5 Gb/s, 5 Gb/s, and 10 Gb/s Autom P802.3ch D2.2 2Cl 149 SC 149.7.1.4 P 172 L 36 Comment Type T The coupling attenuation equ
Microsoft Word - systemC-draft-par2.rtf IEEE-SA Standards Board Project Authorization Request (PAR) Form (2004) The submittal deadlines for the Year 2004 are available. 1. Assigned Project Number P (P
Project 2009-07-28 IEEE 802.16m-09/0036 Project IEEE 802.16 Broadband Wireless Access Working Group < http://ieee802.org/16 > Title IEEE 802.16 TGm Minutes of Session #62, San Francisco, CA Date Submi
Re: [STDS-802-11-TGBE] 答复: [STDS-802-11-TGBE] Requesting agenda time for Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: [STDS-802-11-TGBE] 答复: [STDS-80
Re: [802.3_10SPE] AW: [802.3_10SPE] AW: draft contributions for the 10Mb Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: [802.3_10SPE] AW: [802.3_10SPE]
RE: [RPRWG] RAH: Re: Minutes of Rate Ad Hoc meeting Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index RE: [RPRWG] RAH: Re: Minutes of Rate Ad Hoc meeting To :
[802.3_B400G] Contingent Meeting - IEEE P802.3dj Electronic Meeting (Day Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index [802.3_B400G] Contingent Meeting -
IEEE 802.21 Project IEEE 802.21 Media Independent Handover Services < http://www.ieee802.org/21/ > Title Requirements and Suggested Amendments for IEEE 802.11 Date Submitted January, 2006 Source(s) Vi
Re: [STDS-802-11-TGBE] TGbe CR submission Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: [STDS-802-11-TGBE] TGbe CR submission To : STDS-802-11-TGBE@xx
IEEE P802.3ca D2.0 25/50G-EPON Task Force Initial Working Group ballot commentsApproved Responses # D20459Cl 1 SC 1.4.244a P23 L18 Comment Type ER I believe that this is the first use of the term “env
IEEE P802.3bz D1.0 2.5/5GBASE-T 1st Task Force review comments # 196Cl 113A SC 113A.2 P 193 L 47 Comment Type E Electrical information should be placed where it is called out instead of a mechanical d
P802.3ca May 2017 interim meeting 15 May 2017 FEC Proposal for NGEPON Mark Laubach, Shaohua Yang, Ryan Hirth, Glen Kramer 2 P802.3ca May 2017 interim meeting| • Various FEC codes and performance have
Re: [8023-10GEPON] PIN-PD D/S power budget proposal Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: [8023-10GEPON] PIN-PD D/S power budget proposal To :
Re: [STDS-802-11-TGBE] 11-22-0230-02-00be-cc36-cr-of-cid-4147-and-5311 Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: [STDS-802-11-TGBE] 11-22-0230-02-
Summary of IEEE 802.16 System Requirements 1999-11-04 IEEE 80216sc-99/39 1 Project IEEE 802.16 Broadband Wireless Access Working Group Title Summary of IEEE 802.16 System Requirements Date Submitted 1
[802.3_DWDM] Contingent Meeting - IEEE P802.3dj Electronic Meeting (Day Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index [802.3_DWDM] Contingent Meeting - IE
Re: [STDS-802-11-AANI] Follow up of 802.11 AANI SC Teleconference 20-11- Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: [STDS-802-11-AANI] Follow up of
IEEE Draft P802.3ae/D3.4 Comments P802.3ae Draft 3.4 Comments # 12Cl 44 SC 44.5 P 1678 L Comment Type E Please stop table from flowing over page break. SuggestedRemedy General remedy may be in the Fra
Comparison of options for 40 Gb/s PMD for 10 km duplex SMF and recommendations Optical Navigation Division Comparison of options for 40 Gb/s PMD for 10 km duplex SMF and recommendations Piers Dawe, Da
Bridging Draft 8_12.doc 1. Bridging 1.1 MAC Relevance to Bridging The proposed MAC reference model does not prohibit transparent bridging. Any other 802.17 MAC specific bridging method shall: a) Not p
Draft Contribution to ITU-R Working Party 8F: OFDMA TDD WMAN (IP-OFDMA) Support of Minimum Requirements Received: Subject: Question ITU-R 229-1/8 Technology Institute of Electrical and Electronics Eng
Re: [STDS-802-11-TGBF] 回复: Feedback on 1934r5 Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: [STDS-802-11-TGBF] 回复: Feedback on 1934r5 To : STDS-802-11
Re: [STDS-802-3-25G] 25G CR objective wording Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: [STDS-802-3-25G] 25G CR objective wording To : STDS-802-3-