118132 results found. results are sorted by relevance
  226-250
https://grouper.ieee.org/groups/802/3/cu/comments/8023cu_D20_comments_received_by_ID.pdf
MainTable IEEE P802.3cu D2.0 100 Gb/s and 400 Gb/s over SMF at 100 Gb/s per Wavelength Initial Working Group ballot comments Proposed Response # 1Cl 1 SC 1 P17 L16 Comment Type E The "important Notice
https://grouper.ieee.org/groups/802/17/documents/presentations/nov2001/minutes_111501_d02.pdf
Good Day Markus Meeting Minutes IEEE 802.17 November 20011 ______________________________________________________________________________________ IEEE 802.17 Plenary Meeting, Austin, TX - November 12
https://grouper.ieee.org/groups/1722/contributions/2010/P1722_initial_comment_listing.pdf
MainTable IEEE P1722 Layer 2 Transport for AVB comments Proposed Response # 1Cl Particip SC Participants P 6 L 21 Comment Type E Joern Henneberg's name was inadvertently omitted from the participant l
https://grouper.ieee.org/groups/802/11/Documents/DocumentArchives/2000_docs/03788E-Minutes-of-TGe-Nov-00.doc
doc.: IEEE 802.11-00/378 November 2000 doc.: IEEE 802.11-00/378 IEEE P802.11 Wireless LANs Minutes of 802.11 Task Group E MAC Enhancements Date: November 6, 2000 Author: Tim Godfrey Intersil Phone: 91
https://grouper.ieee.org/groups/802/3/cb/comments/IEEE_P802d3cb_D3p2_Cmt_Resolution_by_ID--20180127_1404CET.pdf
MainTable EEE P802.3cb (D3.2) 2.5 Gb/s and 5 Gb/s Backplane Ethernet 2nd Sponsor recirculation ballot comment Response # r02-1Cl 46 SC 46.3.3.3 P 45 L 14 Comment Type TR The text inserted here is abou
https://grouper.ieee.org/groups/802/3/ca/public/meeting_archive/2019/01/802d3ca_D1_4_proposed.pdf
IEEE P802.3ca D1.4 25/50G-EPON Task Force 5th Task Force review commentsProposed Responses # 391Cl 1 SC 1.4.245a P 20 L 33 Comment Type TR We provide definition for EQ and also list the "EQ" under the
https://grouper.ieee.org/groups/802/11/Documents/DocumentArchives/1992_docs/1192021_scan.pdf
January 1992 Tenltive Minute. of the IEEE 102.11 MAC AdHoc Committee Rlleigh, NC Jlnulry 14-18, 1992 Tu ..... y Jlnulry 14, 1992 Doc:IEEE P802.1/92·21 The meeting was called to order by Chainnan: Robe
https://grouper.ieee.org/groups/802/15/pub/2001/Nov01/01483r9P802-15_TG3-Running-Minutes-Rolling%20Meadows-to-Austin.doc
IEEE P802.15 TG3_Minutes-Rolling-Meadows-to-Austin November, 2001 IEEE P802.15-01/483r9 IEEE P802.15 Wireless Personal Area Networks Project IEEE P802.15 Working Group for Wireless Personal Area Netwo
https://grouper.ieee.org/groups/802/15/pub/04/15-04-0377-11-003a-consolidation-explanations-no-vote-confirmation.doc
Orlando TG3a Minutes March, 1994 DOC: IEEE P802.11-94/xxx July 2004 IEEE P802.15-04/377r11 IEEE P802.15 Wireless Personal Area Networks Project IEEE P802.15 Working Group for Wireless Personal Area Ne
https://grouper.ieee.org/groups/802/3/bj/public/nov12/EEE_Resolved_by_cls.pdf
MainTable IEEE P802.3bj D1.2 100 Gb/s Backplane and Copper Cable 3rd Task Force review comments # 160Cl 00 SC 0 P L Comment Type ER The term "100GBASE-P" is now used in 13 separate instances the draft
https://grouper.ieee.org/groups/1788/email/pdfUDuSDSsrNx.pdf
submitted May 18, accepted November 28, 2011, published in Numerical Algorithms 61(1), 1-34 (2012). FAST INTERVAL MATRIX MULTIPLICATION SIEGFRIED M. RUMP ∗ Abstract. Several methods for the multiplica
https://grouper.ieee.org/groups/802/3/cj/comments/P8023-D3p1-Comments-Final-byCls-r1.pdf
MainTable IEEE P802.3 (IEEE 802.3cj) D3.1 Maintenance #12 (Revision) 1st Sponsor recirculation ballot comments # r01-4Cl 0 SC 0 P L Comment Type G This draft meets all editorial requirements. Suggeste
https://grouper.ieee.org/groups/802/11/email/stds-802-11-tgbe/msg02060.html
[STDS-802-11-TGBE] Revision 56 // Re: Compendium of straw polls and pote Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index [STDS-802-11-TGBE] Revision 56 // R
https://grouper.ieee.org/groups/802/3/az/comments/8023azD1p4proposed.pdf
MainTable IEEE P802.3az D1.4 Energy Efficient Ethernet commentsProposed responses June 2009 # 46Cl 00 SC 0 P L Comment Type ER In many of the state machine figures, new transition criteria include com
https://grouper.ieee.org/groups/802/3/ch/comments/P8023ch_D3p0_comments_by_Topic_final_responses.pdf
MainTable D3.0 Physical Layer Specifications and Management Parameters for 2.5 Gb/s, 5 Gb/s, and 10 Gb/s Autom P802.3ch D3.0 i-47Cl 149A SC 149A.4 P 197 L27 Comment Type T *** Comment submitted with t
https://grouper.ieee.org/groups/802/3/ch/comments/P8023ch_D3p0_comments_by_Page_Line_final_responses.pdf
MainTable D3.0 Physical Layer Specifications and Management Parameters for 2.5 Gb/s, 5 Gb/s, and 10 Gb/s Autom P802.3ch D3.0 i-1Cl 0 SC 0 P L Comment Type G This draft meets all editorial requirements
https://grouper.ieee.org/groups/802/3/ch/comments/P8023ch_D3p0_comments_by_Clause_subclause_final_responses.pdf
MainTable D3.0 Physical Layer Specifications and Management Parameters for 2.5 Gb/s, 5 Gb/s, and 10 Gb/s Autom P802.3ch D3.0 # i-3Cl FM SC FM P22 L16 Comment Type E According to the SA Editors, the "I
https://grouper.ieee.org/groups/802/3/az/comments/8023azD1p4proposed2.pdf
MainTable IEEE P802.3az D1.4 Energy Efficient Ethernet commentsProposed responses June 2009 Proposed Response # 1Cl 78 SC 78.1.2 P 228 L 47 Comment Type TR LPI Client will need additional interfaces t
https://grouper.ieee.org/groups/802/11/Documents/DocumentArchives/1992_docs/1192064a9_scan.pdf
1993 Doc: IEEE P802.11 - 92/64a9 Issue Identification: 4.5 (Topic: Network Types). Can a station be a member of an ad-hoc and non-ad-hoc network at the same time? Alternatives: I) - Yes 2) -No 3) - Ma
https://grouper.ieee.org/groups/802/3/ch/comments/P8023ch_D3p0_comments_by_Comment_ID_final_responses.pdf
MainTable D3.0 Physical Layer Specifications and Management Parameters for 2.5 Gb/s, 5 Gb/s, and 10 Gb/s Autom P802.3ch D3.0 Response # i-1Cl 0 SC 0 P L Comment Type G This draft meets all editorial r
https://grouper.ieee.org/groups/802/15/pub/2002/Jan02/02055r0P802-15_WG-LB12-Comment-Resolution-Database.mdb
802.15.3/D09 ClauseList Editor Email Owner Chief NoWritten NoAction NoSig TRproblem Done "00","01","02","03","04","05","07","11" James Gilb jgilb@mobilian.com true true 875 0 0 0 0 "06","09" Allen Heb
https://grouper.ieee.org/groups/802/3/cd/comments/8023cd_D30_final_comment_responses_by_clause.pdf
IEEE P802.3cd 50 Gb/s, 100 Gb/s, 200 Gb/s Ethernet Initial Sponsor ballot comments # i-2Cl 000 SC 000 P L Comment Type ER Update the editing instructions throughout the document to reference the new r
https://grouper.ieee.org/groups/802/minutes/jul2006/Minutes%20-%20Friday%20July%2021,%202006.pdf
Microsoft Word - Minutes - Friday July 21, 2006.doc 7/21/2006 Page 1 AGENDA & MINUTES (Unconfirmed) - IEEE 802 LMSC EXECUTIVE COMMITTEE MEETING (updated July 24, 2006) Friday July 21, 2006 1:00 PM – 6
https://grouper.ieee.org/groups/802/minutes/2015_03/2015_0313_Close_Minutes_R1.pdf
IEEE 802 Mar 2015 Closing Meeting Minutes MINUTES (Unconfirmed) IEEE 802 LMSC EXECUTIVE COMMITTEE MEETING, Revision 1 Prepared by John D’Ambrosia, Recording Secretary Friday, Mar 13 – 1:00 p.m. All ti
https://grouper.ieee.org/groups/802/3/cj/comments/P8023-D3p0-Comments-Final-byID.pdf
MainTable IEEE P802.3 (IEEE 802.3cj) D3.0 Maintenance #12 (Revision) Initial Sponsor ballot comments Response # i-1Cl 45 SC 45.2.3.1.5 P222 L28 Comment Type T "The speed selection bits 3.0.5:2, when s