Improved PTP Timestamping Accuracy IEEE P802.3cx PTP Task Force, Comment Area Improved PTP Timestamping Accuracy IEEE P802.3cx PTP Task Force Ballot Comments Area (Please see the Private Area for the
[RPRWG] Uploads almost done - please check web-page Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index [RPRWG] Uploads almost done - please check web-page To :
Quake Technologies Petre Popescu 1/27/03 1/1 Clause 54 SIGNAL_DETECT 1. Current Text 2. Proposed Text Table 54-5--SIGNAL_DETECT value definition aWorst-case local system noise includes all receiver co
objectives-after-july08 1 Define a mechanism to reduce power consumption during periods of low link utilization for the following PHYs – 100BASE-TX (Full Duplex) – 1000BASE-T (Full Duplex) – 10GBASE-T
RE: Interface reality check Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index RE: Interface reality check To : "'HSSG_reflector'" < stds-802-3-hssg@xxxxxxxx >
[8023-POEP] Thursday end time Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index [8023-POEP] Thursday end time To : STDS-802-3-POEP@xxxxxxxxxxxxxxxxx Subject :
[802.3_YANG] P802.3.2 D0.1 comments & proposed responses uploaded and Ma Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index [802.3_YANG] P802.3.2 D0.1 comments
Doc.: IEEE 802.15-3/Clause 9 March 2001 doc.: IEEE 802.15-01/121r1 IEEE P802.15 Wireless Personal Area Networks Project IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Title Dra
Doc.: IEEE 802.15-3/Clause 9 March 2001 doc.: IEEE 802.15-01/121r1 IEEE P802.15 Wireless Personal Area Networks Project IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Title Dra
The Commentary Comment Resolution Database Manager User Instructions Revision 3: February 2004 CONTENTS 2INTRODUCTION GETTING STARTED 4 Setting up the Comment Resolution Database 4 Updating the Commen
Standard Test Method for Evaluation of Message Communications between IEDs in Substations PC37.115 Draft 9 December 2002 Draft Standard Test Method for Use in the Evaluation of Message Communications
Standard Test Method for Evaluation of Message Communications between IEDs in Substations PC37.115 Draft 9 December 2002 Draft Standard Test Method for Use in the Evaluation of Message Communications
[STDS-802-11-TGBE] Revision 53 - IEEE802.11be D0.1 Spec Text Writing: Vo Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index [STDS-802-11-TGBE] Revision 53 - IE
Re: [STDS-802-11-TGM] Minutes posted for Oct 12th Telecon Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: [STDS-802-11-TGM] Minutes posted for Oct 12th
Microsoft Word - C80216i-06_023.doc 2006-07-11 IEEE C802.16i-06/023 0 Project IEEE 802.16 Broadband Wireless Access Working Group Title Process and rules for development of SNM
Microsoft Word - minutes_01_0105_approved.doc Approved Minutes IEEE P802.3AP - Backplane Ethernet January 24 – 26, 2005 Vancouver, BC Prepared by: John D’Ambrosia Meeting convened at 8:32 am, January
Re: [STDS-802-11-TGBE] PDT-MLO-Setup-Security Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: [STDS-802-11-TGBE] PDT-MLO-Setup-Security To : STDS-802-11
Re: [802SEC] +++ Early Close 10-day EC Motion+++ Approval of response to Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: [802SEC] +++ Early Close 10-day
Re: [STDS-802-11-TGBE] PDT-MLO-Setup-Security Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: [STDS-802-11-TGBE] PDT-MLO-Setup-Security To : STDS-802-11
Draft 754R Minutes - 2 March 2018 Recorded by David Hough Also at: http://754r.ucbtest.org/minutes/2018-03-02-minutes.txt The 754R revision group met by teleconference on 2 March 2018: convened at 8:0
Microsoft Word - Tsb155_d1.2-dec10-2004.doc PN-3-0134 to become ANSI/TIA-TSB-155 Draft 1.2 1 2 ADDITIONAL GUIDELINES FOR 4-PAIR 100 Ω CATEGORY 6 CABLING FOR 10GBASE-T 3 APPLICATIONS 4 DRAFT 1.2 5 Dece
Re: [EFM] Standards assumptions - was PMD considerations Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: [EFM] Standards assumptions - was PMD considera