MainTable IEEE P802.3bw (D3.2.1) 100BASE-T1 2nd Sponsor recirculation ballot comments # r02-15Cl 00 SC 0 P 1 L 18 Comment Type E When the words "twisted" and "pair" and used together in the draft text
March 1996 Doc: IEEE P802.11-96/061 Results of Ballot on Draft Standard 03.0 Resolution on clauses 15 Seq. Section your Cmnt Part CommentlRationale Corrected Text DispositionlRebuttal # number ini- ty
MainTable IEEE P802.3bw (D3.2.1) 100BASE-T1 2nd Sponsor recirculation ballot comments Proposed Response # r02-1Cl 45 SC 45.2.1.6 P 24 L 38 Comment Type E The text refers to Table 45-4; however, the ta
MainTable IEEE P802.3 (IEEE 802.3bh) Ethernet Initial Working Group ballot comments # 172Cl 00 SC P L Comment Type TR There is no 12-bit Manufacturer ID in the list of registries. (There is a 14-bit M
MainTable IEEE P802.3 (IEEE 802.3bh) Ethernet Initial Working Group ballot comments Response # 1Cl 01 SC 1.4 P 17 L 39 Comment Type ER The Definitions section is 27 pages long. Although it is finely s
IEEE P802.3cf D2.1 YANG Data Model Definitions 1st Working Group recirculation ballot comments Comments Received # 106Cl FM SC FM P7 L13 Comment Type E Please change 'IEEE P802.3.2/802.3cf' to read 'I
IEEE P802.3bj D2.1 100 Gb/s Backplane and Copper Cable 1st Working Group recirculation ballot comments Response # 1Cl 78 SC 78.5 P 90 L 1 Comment Type T In Table 78-4 there are many lines devoted to t
MINUTES (Unconfirmed) IEEE 802 LMSC EXECUTIVE COMMITTEE MEETING, Revision 1 Friday, November 20, 2009 – 1:00 p.m. All times Eastern Standard Time (EST) Atlanta, GA EC members present: Paul Nikolich
IEEE P802.3bj D2.1 100 Gb/s Backplane and Copper Cable 1st Working Group recirculation ballot comments # 25Cl 00 SC 0 P L Comment Type E Now that Clause 74 has been brought in to the draft, there are
MainTable IEEE 802.3av d2.0 10G-EPON comments IEEE 802.3av Draft 2.0 Proposed Responses # 1773Cl 00 SC P 97 L 52 Comment Type E Title of Figure 76-2 has a period ("."). SuggestedRemedy The period shou
MainTable IEEE P802.3bw D1.2 100BASE-T1 Initial Working Group ballot comments # 301Cl SC 0 P 1 L 2 Comment Type ER Says that this is an Amendment of 802.3-2012". It actually will be an amendment of 80
MainTable IEEE P802.3bw D1.2 100BASE-T1 Initial Working Group ballot comments Response # 1Cl 96 SC 96.2.1.1 P 32 L 26 Comment Type ER Extra period at end of line.. SuggestedRemedy Use one. ACCEPT. Use
Re: [802.3_MAINT] Follow up on proposed Comment to add distance specific Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: [802.3_MAINT] Follow up on prop
Microsoft Word - MI-0701-05.doc 1 April 2001 To: IEEE 802 Members & Attendees – The July 2001 IEEE 802 Plenary Meeting will be held at the Portland Marriott Downtown. This package contains information
Re: MANDATORY RAC COORDINATION: IEEE P1901/Draft 4.1 Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: MANDATORY RAC COORDINATION: IEEE P1901/Draft 4.1 To
Orlando TG3a Minutes March, 1994 DOC: IEEE P802.11-94/xxx September 2004 IEEE P802.15-04/511r4 IEEE P802.15 Wireless Personal Area Networks Project IEEE P802.15 Working Group for Wireless Personal Are
Agenda and General Information - 28 Oct 2021 Agenda and General Information IEEE 802.3 Beyond 400 Gb/s Ethernet Study Group 28 Oct 2021 Electronic Meeting John D’Ambrosia, Chair, IEEE 802.3 Beyond 400
cq_agenda_0519 Page 1 Agenda and General Information IEEE P802.3cq Power over Ethernet over 2 Pairs (Maintenance #13) Chad Jones Cisco Systems, Inc. Salt Lake City, Utah May 21, 2019 Page 2IEEE P802.3
Re: [STDS-802-11-TGBE] CR doc 1381r1 - Beacon-A frame Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: [STDS-802-11-TGBE] CR doc 1381r1 - Beacon-A frame