MainTable IEEE P802.3bu Power over Data Lines 3rd Task Force review comments Proposed Response # 1Cl 104 SC 104.3.2 P 15 L 30 Comment Type TR This comment applies to Table 104-1. The power class table
Microsoft PowerPoint - sim-multi-hop.ppt Delay and Delay Variation Simulation Results for Multi-hop Conventional Ethernet Cases with Bursting/Bunching Geoffrey M. Garner gmgarner@comcast.net SAMSUNG
Re: RESPONSE REQUIRED: EUI Tutorial on RAC Private Page for review Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: RESPONSE REQUIRED: EUI Tutorial on RA
Microsoft PowerPoint - 802 20 proposal MOT 2007 v7.ppt 1 The contributor is familiar with IEEE patent policy, as outlined in Section 6.3 of the IEEE-SA Standards Board Operations Manual
IEEE P802.3cy D2.21 10G+ Auto Task Force 2nd Working Group recirculation ballot commentsProposed Responses # 822Cl FM SC FM P 10 L 3 Comment Type E This boxed paragraph is part of the published standa
Re: [STDS-802-11-TGBE] [EXT] Re: [STDS-802-11-TGBE] CR doc 1381r1 - Beac Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: [STDS-802-11-TGBE] [EXT] Re: [S
IEEE802.15 WG minutes IEEE P802.15 Wireless Personal Area Networks Project IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Title IEEE802.15 WG minutes Date Submitted 19 March, 2
IEEE 802.21 Project IEEE 802.21 Media Independent Handover Services < http://www.ieee802.org/21/ > Title MEDIA INDEPENDENT HANDOVER Date Submitted May, 2005 Source(s) Joint Harmonized Contribution Re:
MainTable comments # 280Cl 00 SC P L Comment Type E SuggestedRemedy Comment Status X Response Status C NoName Proposed Response # 205Cl 00 SC P 2 L 1 Comment Type E Add note to balloters to indicate t
MainTable P802.3ah Draft 1.732 Comments # 56001Cl 00 SC P L Comment Type E To accept the editorial recommendations from the IEEE Staff Editor on Clauses 00, 01, 56 & 66 SuggestedRemedy Proposed Respon
March, 2005 doc.: IEEE 802.11-05/0286r0 IEEE P802.11 Wireless LANs Approved Minutes of the IEEE P802.11 Full Working Group Date: 2005-03-14 Author(s): Name Company Address Phone email Tim Godfrey Cone
IEEE P802.3bt D2.0 4-Pair PoE Initial Working Group ballot comments 172Cl 00 SC 0 P L Comment Type ER There are a large number of broken cross references in the draft. These should either be made into
IEEE P802.3bt D2.0 4-Pair PoE Initial Working Group ballot comments Proposed Response # 1Cl 33 SC 5.1.2 P 175 L 51 Comment Type TR The editor's note refers to TABLE 33-22. This appears to be the wrong
MainTable P802.3ah Draft 1.732 Comments # 56001Cl 00 SC P L Comment Type E To accept the editorial recommendations from the IEEE Staff Editor on Clauses 00, 01, 56 & 66 SuggestedRemedy Proposed Respon
MainTable IEEE P802.3bj D1.0 100 Gb/s Backplane and Copper Cable 1st Task Force review comments Response # 1Cl 93 SC 93.8.1 Table 93-4 P 131 L 11 Comment Type T Common mode DC output voltage is specif
MainTable IEEE P802.3bj D1.0 100 Gb/s Backplane and Copper Cable 1st Task Force review comments # 286Cl 00 SC 0 P L Comment Type ER For channel parameters, "differential insertion loss" and "insertion
Comments on Draft 2.1 as of 8th August 2005 IEEE P802.3aq Draft 2.1 Comments # 1001Cl 00 SC P L Comment Type TR See John George's Comment #6 in recirculation package. SuggestedRemedy Per suggested rem
MainTable IEEE P802.3br D3.0 Interspersing Express Traffic (IET) Initial Sponsor ballot comments March 2016 # i-1Cl FM SC FM P 1 L 1 Comment Type E Based on IEEE P802.3by entering sponsor ballot in No
802.3cb 2.5GBASE-X PCS/PMA proposed text for draft 0.1 802.3cb 2.5GBASE-X PCS/PMA proposed text for draft 0.1 William Lo (Marvell) 1 29 February 2016 To make editing instructions easier to understand
IEEE P802.3bz D3.0 2.5G/5GBASE-T Initial Sponsor ballot comments # i-60Cl 0 SC 0 P 67 L 1 Comment Type E Inconsistent spelling of signaling (42 instances) vs. signalling (8 instances). I think the for
MainTable IEEE802.3bu D2.0 One Pair Power over Datalines 9th Task Force review comments # 18Cl 30 SC 30.14.1 P 20 L 50 Comment Type ER Missing period at end of sentence. SuggestedRemedy See comment RE
MainTable IEEE P802.3bw (D3,0) 100BASE-T1 Initial Sponsor ballot comments # i-15Cl 00 SC 0 P L Comment Type TR The draft is not aligned with the project objectives. Support fast-startup operation usin
9209r58a-h-Reg-proposed-second-letter-99-231.PDF September 1999 doc.: IEEE 802.11-99/209-r5 Standards Working Group IEEE 802 Local and Metropolitan Area Network Standards Committee Homepage at http://
IEEE P802.3bz D3.0 2.5G/5GBASE-T Initial Sponsor ballot comments i-112Cl 126 SC 126.7.3.1 P 170 L 14 Comment Type TR 100MHz is enough bandwidth for for 2.5G and 5G PBO calculation, but 200MHz should b