IEEE 802.3by D2.1 25 Gb/s Ethernet 1st Working Group recirculation ballot comments # 88Cl FM SC FM P 11 L 17 Comment Type E One would reasonably assume that "the existing base standard and its amendme
MainTable IEEE P802.3ct D3.1 100 Gb/s over DWDM systems 1st Sponsor recirculation ballot comments Proposed Response # R1-1Cl 1 SC 1.4 P22 L40 Comment Type TR Concerns have been raised about the actual
IEEE 802.17 Terms and Definitions Proposed Comment Resolutions Sorted by Commenter Name # 1Cl 01 SC 01.39 P 3 L Comment Type E I think it is confusing SuggestedRemedy It should read ..at the destinati
PHY layer proposal for BWA 2000-01-05 IEEE 802.16.1pc-00/09 Project IEEE 802.16 Broadband Wireless Access Working Group Title PHY layer proposal for BWA Date Submitted January 5, 2000 Source Jay Klein
AGENDA & MINUTES (Unconfirmed) - IEEE 802 LMSC EXECUTIVE COMMITTEE MEETING, Revision 00 Monday, November 14, 2008 – 1:00 p.m. All times central standard time (CST) Dallas, TX EC members present: Paul
MainTable IEEE P802.3an D3.0 10GBASE-T Comments # 15Cl 00 SC 0 P 0 L 0 Comment Type E P. Dawe - Editorials; capitals, column widths, font sizes, odd marks in figures, front matter, 802.3-2005 vs 802.3
IEEE 802.17 Terms and Definitions Proposed Comment Resolutions Sorted by Subclause # 41Cl 01 SC P L Comment Type E ] Should remove SRP definitition, it's SuggestedRemedy Remove the item Proposed Respo
Untitled Document 16 September, 2004 IEEE - 04/401r2 John C. Sarallo - Appairent Technologies g ect ein. y Submission Page 1 IEEE P802.15 Wireless Personal Area Networks Project IEEE P802.15 Working G
IEEE 802.3by D2.1 25 Gb/s Ethernet 1st Working Group recirculation ballot comments Response # 1Cl 108 SC 108.5.2.4 P 106 L 15 Comment Type T CL 108.5.2.4 In 802.3bj, CL 91.5.3.7 (AM mapping and insert
IEEE P802.3ca D1.5 25/50G-EPON Task Force 6th Task Force review commentsProposed Responses # 481Cl 1 SC 1.4.245a P22 L33 Comment Type E Surely there are other "unit of measurement of volume of informa
IEEE P802.3bq D2.2 Physical Layer and Management Parameters for 40Gb/s Operation, Type 40GBASE-T 2nd Working Group recirculation ballot comments Proposed Response # 123Cl 113 SC 113.3.5.3 P 110 L 33 C
MainTable IEEE P802.3ct D3.1 100 Gb/s over DWDM systems 1st Sponsor recirculation ballot comments Response # R1-1Cl 1 SC 1.4 P22 L40 Comment Type TR Concerns have been raised about the actual need for
PHY layer proposal for BWA 2000-04-27 IEEE 802.16.1pc-00/20r2 1 Project IEEE 802.16 Broadband Wireless Access Working Group Title PHY layer proposal for BWA Date Submitted 2000-04-14 (Revision 2: 2000
IEEE P802.3bq D2.2 Physical Layer and Management Parameters for 40Gb/s Operation, Type 40GBASE-T 2nd Working Group recirculation ballot comments 233Cl 113 SC 113.5.3.2 P L Comment Type E SuggestedReme
MainTable IEEE P802.3ct D3.1 100 Gb/s over DWDM systems 1st Sponsor recirculation ballot comments # R1-1Cl 1 SC 1.4 P22 L40 Comment Type TR Concerns have been raised about the actual need for a defini
Untitled Document 16 September, 2004 IEEE - 04/401r2 John C. Sarallo - Appairent Technologies g ect ein. y Submission Page 1 IEEE P802.15 Wireless Personal Area Networks Project IEEE P802.15 Working G
MainTable IEEE P802.3ct D3.1 100 Gb/s over DWDM systems 1st Sponsor recirculation ballot comments # R1-1Cl 1 SC 1.4 P22 L40 Comment Type TR Concerns have been raised about the actual need for a defini