Re: On trits & tetrits... Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: On trits & tetrits... To : "Dan Zuras Intervals" < intervals08@xxxxxxxxxxxxxx
Email Archive Email Archive Thread Index (Page 35 of 35) Date Index First Page Prev Page Next Page Last Page RE: [PP-DIALOG] An LOA draft addressing some but not all issues on the table at PatCom , (c
[STDS-802-11] Audited motions from closing plenary Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index [STDS-802-11] Audited motions from closing plenary To : S
126th IEEE 802.11 Session Agenda ARC SC Nov 2012 ARC SC PLENARY Aritecture Standing Committee 0 Chair - Mark Hamilton (SpectraLink) - Report on activities since last 802.11 session - Continue work on
Re: [802.3ae] WIS defect conditions Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: [802.3ae] WIS defect conditions To : Gareth.Edwards@xxxxxxxxxx Subje
Interface reality check Brad, The simplicity of this version has a certain elegance that is quite compelling. While this seems to deviate from previous concepts of what an RS might be, I kind of like
End of Burst Position End of Burst Position Frank Effenberger Huawei Technologies Consensus position • We will use an EOB pattern to detect the end of the burst • That pattern will be all zeroes • Tha
MDI RL for PoDL Motion Motion • Adopt MDI RL baseline text as proposed in gardner_3bu_4_0315. Y: 18 N: 0 A: 8 Proposed Baseline Text A 100BASE-T1 PoDL System shall meet or exceed Equation (104-TBD) fo
Changes to 86 and 86A for multi-lane BER counting and specification Draft Amendment to IEEE Std 802.3-2008 IEEE Draft P802.3ba/D3.0mod IEEE 802.3ba 40Gb/s and 100Gb/s Ethernet Task Force 18th Jan 2010
[HSSG] IEEE 802.3 September Interim Session - September 2007 - Seoul, KR Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index [HSSG] IEEE 802.3 September Interim
[802.3EEESG] IEEE 802.3 September Interim Session - September 2007 - Seo Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index [802.3EEESG] IEEE 802.3 September I
Clause 104 Cleanup GITESH BHAGWAT, ANDY GARDNER, HEATH STEWART SANTA BARBARA DESIGN CENTER Clause 104 Cleanup 1 Presentation Outline ► Cleanup baseline text for describing SCCP Commands Previous ins
[8023-10GEPON] IEEE 802.3 September Interim Session - September 2007 - S Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index [8023-10GEPON] IEEE 802.3 September
[802.3EEESG] IEEE 802.3 September Interim Session - September 2007 - Seo Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index [802.3EEESG] IEEE 802.3 September I
[HSSG] IEEE 802.3 September Interim Session - September 2007 - Seoul, KR Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index [HSSG] IEEE 802.3 September Interim
Modification to Clause 104 for SCCP Commands GITESH BHAGWAT, ANDY GARDNER, HEATH STEWART SANTA BARBARA DESIGN CENTER Clause 104 Cleanup 1 Presentation Outline ► Cleanup baseline text for describing SC
[STDS-802-11-TGBF] 答复: Discussion on measurement setup terminate frame f Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index [STDS-802-11-TGBF] 答复: Discussion o
Slide 1 Agenda and General Information IEEE 802.3cb Task Force 2.5 Gb/s and 5 Gb/s Backplane Dan Smith, Chair Seagate Technology Vancouver, BC, March 14/15/16, 2017 Agenda (multiple days) • Meeting op