IEEE P802.3df D1.1 2nd Task Force review comments # 47Cl FM SC FM P 1 L31 Comment Type E "adds MAC parameters, Physical Layers, and management parameters" but we talk about "the Physical Layer" like "
minutes_1199 Jeff Warren Date 12/08/99 Extreme Networks Page 1 of 27 IEEE 802.3 HSSG Plenary Meeting Kauai, Hawaii IEEE 802.3, HSSG – 10 Gigabit Ethernet MINUTES Study Group Plenary Meeting November 8
IEEE P802.3ck D3.1 1st Sponsor recirculation ballot comments # R1-14Cl FM SC FM P 1 L 28 Comment Type E This list is not correct. It also lists five previous amendments yet P802.3cx is identified as A
untitled IEEE P802.3ap Comments 3/14/2005 # 120Cl 01 SC 1.4 P 1 L 1 Comment Type TR Add definition of terms introduced in Backplane Ethernet to subclause 1.4. Suggested Remedy Create a section to hold
-- EDITOR'S NOTE: It is expected that the IF-CAP-STACK-MIB module will be deleted during the -- IEEE 802 LMSC sponsor ballot on this revision. It will be replaced with a pointer to an IETF RFC -- that
November, 1994 I. INTRODUCTION SPECIES EXTINCTION? JIM LOVEITE ApPLE COMPUTER, INC. NOVEMBER 8,1994 DOC: IEEE P802.11-94/294 This is the Law of the Yukon, that only the strong shall thrive; That surel
Microsoft Word - Patent_Policy_FAQ_111114_redline_to_current.pdf.docx Understanding Patent Issues During IEEE Standards Development IEEE Standards Association | 445 Hoes Lane | Piscataway NJ 08854 USA
July 2003 Welborn, XtremeSpectrum, Inc.Slide 1 doc.: IEEE 802.15-03/153r9 Submission Project: IEEE P802.15 Working Group for Wireless Personal Area NProject: IEEE P802.15 Working Group for Wireless Pe
IEEE P802.3cd 50 Gb/s, 100 Gb/s, 200 Gb/s Ethernet 1st Sponsor recirculation ballot comments # r01-16Cl 000 SC 0 P L Comment Type E The numbering of some of the references to definitions in the draft
IEEE P802.3bq D3.0 25G/40GBASE-T Ethernet Initial Sponsor ballot comments # i-138Cl 0 SC 0 P L Comment Type GR in bz in the alin clause there is a sentence that the calculation is done up tp 100 and 2
MINUTES (Unconfirmed) IEEE 802 LMSC EXECUTIVE COMMITTEE MEETING, Revision 3 Friday, July 22, 2011 – 1:00 p.m. All times Pacific Daylight Time (PDT) San Francisco, California EC members present: Pau
IEEE P802.3ck D2.2 100/200/400 Gb/s Electrical Interfaces Task Force 2nd Working Group recirculation ballot comments Proposed Response # 1Cl 00 SC 0 P 0 L 0 Comment Type E Keep 802.3ck aligned with th
IEEE P802.3bq D3.0 25G/40GBASE-T Ethernet Initial Sponsor ballot comments # i-138Cl 0 SC 0 P L Comment Type GR in bz in the alin clause there is a sentence that the calculation is done up tp 100 and 2
Final responses to comments against Draft 2.2 (sorted by comment ID) IEEE P802.3ap D2.2 BackPlane Commentsap Draft 2.2 Response # 1Cl 45 SC 45.2.7.100 P 47 L 1 Comment Type E Correct editors comment a
MainTable IEEE P802.3 (IEEE 802.3cj) D2.0 Maintenance #12 (Revision) Initial Working Group ballot comments # 23Cl 00 SC 0 P L Comment Type E http://www.ieee802.org/3/WG_tools/editorial/requirements/wo
IEEE P802.3bt D1.7 4-Pair Power-over-Ethernet 10th Task Force review comments 2Cl 00 SC 0 P L Comment Type ER Not all changes in the draft have an associated editing instruction SuggestedRemedy Go thr
IEEE P802.3ck D2.2 100/200/400 Gb/s Electrical Interfaces Task Force 2nd Working Group recirculation ballot comments # 1Cl 00 SC 0 P 0 L 0 Comment Type E Keep 802.3ck aligned with the new revision 802
IEEE P802.3bq D3.0 25G/40GBASE-T Ethernet Initial Sponsor ballot comments Response # i-1Cl 28 SC 28.3.1 P 27 L 8 Comment Type E In the editing instruction "the first list" should be "in the first list