118056 results found. results are sorted by relevance
  301-325
https://grouper.ieee.org/groups/802/3/ae/public/mar01/ewen_1_0301.pdf
10GBASE-R Test Patterns 10GBASE-R Test Patterns John Ewen IBM jfewen@us.ibm.com IEEE 802.3ae 3/12/2001 10GBASE-R Test Patterns IBM Test Pattern • Want to evaluate “pathological” events that occur on a
https://grouper.ieee.org/groups/802/mbwa/SG_Docs/802m_ecsg-02-14.pdf
2002–11–14 802m_ecsg-02/14 Response to Comments from 802.16 Roger, Thank you for your review of our PAR and your comments. Our reply follows: (1)We are concerned that the MBWA PAR has distinctly limit
https://grouper.ieee.org/groups/802/3/db/public/July-01-2021/approved_meeting_minutes_3db_01_070121.pdf
1 Approved Minutes IEEE P802.3db 100 Gb/s, 200 Gb/s, and 400 Gb/s Short Reach Fiber Task Force Interim Meeting Webex Meeting July 1, 2021 Prepared by Mabud Choudhury Group Name: IEEE P802.3db 100 Gb/s
https://grouper.ieee.org/groups/802/16/liaison/docs/L80216-04_10r1.pdf
Technical Report: Service & Network Requirements for 2.3 GHz Portable Internet Issued No. : 2004WG3025-006 Date : March 6, 2004 TTA Portable Internet PG - International Coordination Ad Hoc Group Telec
https://grouper.ieee.org/groups/802/16/tg3_4/contrib/80216abc-01_51r1.pdf
Proposed Addition of Section 8.3.3.1.7 ["Channel Quality Measurements at the Subscriber Station"] to Document 80216ab_01/01r2 2001-10-25 IEEE 802.16abc-01/51r1 0 Project IEEE 802.16 Broadband Wireless
https://grouper.ieee.org/groups/802/3/dc/comments/P8023_D3p1_comments_received_by_id.pdf
MainTable IEEE P802.3 (IEEE 802.3dc) D3.1 Maintenance #16 (Revision) 1st Sponsor recirculation ballot comments Proposed Response # R1-1Cl 142 SC 142.3.1 P 5523 L 1 Comment Type E The figure 142-12 los
https://grouper.ieee.org/groups/802/21/email21/doc00057.doc
IEEE 802.21 2006-01-11 21-06-0492-03-0000-GenRefModel.doc Project IEEE 802.21 Media Independent Handover Services < http://www.ieee802.org/21/ > Title 21-06-0492-01-0000-GenRefModel.doc Date Submitted
https://grouper.ieee.org/groups/802/3/100GNGOPTX/email/msg00049.html
Re: [802.3_100GNGOPTX] Reach on MMF Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: [802.3_100GNGOPTX] Reach on MMF To : STDS-802-3-100GNGOPTX@xxxxxxxxx
https://grouper.ieee.org/groups/802/11/email/stds-802-11-tgm/msg02242.html
Re: [STDS-802-11-TGM] Teleconference reminder: June 14 @ 10am ET, re 21/ Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: [STDS-802-11-TGM] Teleconferenc
https://grouper.ieee.org/groups/802/3/ad/public/nov98/jeffree_3_1198.pdf
1 1 Link Aggregation Control Protocol - Update Presentation to the Link Aggregation Task Force, November, 1988 Tony Jeffree 2 State of Play • Further refinement of the design based on functionality pr
https://grouper.ieee.org/groups/802/3/cz/public/13_oct_2020/perezaranda_3cz_03a_131020_10G_link_budget.pdf
perezaranda_OMEGA_03_131020_10G_link_budget IEEE 802.3 OMEGA Task Force - 13th Oct 2020 Ad-hoc PO F Knowledge Development Rubén Pérez-Aranda OMEGA 10 Gb/s link budget analysis IEEE 802.3 OMEGA Task Fo
https://grouper.ieee.org/groups/802/17/email/msg01095.html
RE: [RPRWG] RAH: Re: Minutes of Rate Ad Hoc meeting Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index RE: [RPRWG] RAH: Re: Minutes of Rate Ad Hoc meeting To :
https://grouper.ieee.org/groups/802/3/dj/public/24_03/lusted_3dj_03a_2403.pdf
COM Reference RX Progress Update – 11 March 2024 COM Reference RX Progress Update – 11 March 2024 Kent Lusted, Intel Corporation, IEEE P802.3dj Task Force Electrical Track Chair Rich Mellitz, Samtec I
https://grouper.ieee.org/groups/802/3/dj/public/24_01/cheng_3dj_01b_2401.pdf
Adoption of coherent baselines in P802.3dj Adoption of coherent baselines in P802.3dj Weiqiang Cheng, China Mobile Tom Williams, Cisco Haojie Wang, China Mobile Or Vidal, Alphawave Supporters • Guangc
https://grouper.ieee.org/groups/802/3/da/comments/802.3da_D0p51_Responses_Topic_09172021.pdf
IEEE P802.3da D0.51 10 Mb/s SPMD Enhancement 3rd Task Force review comments 37Cl 168 SC 168.10 P 64 L 38 Comment Type T Editors note says "Consider whether any of these are dependent on the mixing seg
https://grouper.ieee.org/groups/802/18/Meeting_documents/2002_January/RR-02-011r0_Comments-on-SEC-PARs.doc
doc.: IEEE 802.RR-02/011r0 January 2002 doc.: IEEE 802.RR-02/011d1 IEEE P802 Radio Regulations Comments received on Proposed Rules Changes for Wireless PARs Introduction At the November 2001 Friday SE
https://grouper.ieee.org/groups/802/3/10GEPON_study/email/msg01233.html
Re: [8023-10GEPON] FW: Downstream wavelength-continued Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: [8023-10GEPON] FW: Downstream wavelength-continue
https://grouper.ieee.org/groups/802/11/email/stds-802-11/msg06494.html
Re: [STDS-802-11] Proposed resolution for 802.11me Rev 1.0, CID 2346 on Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: [STDS-802-11] Proposed resolutio
https://grouper.ieee.org/groups/802/3/100GNGOPTX/email/msg00087.html
Re: [802.3_100GNGOPTX] Emerging new reach space Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: [802.3_100GNGOPTX] Emerging new reach space To : STDS-80
https://grouper.ieee.org/groups/802/15/pub/2002/May02/02103r2P802-15_SG3a-PAR-5Criteria.doc
IEEE P802.15 AltPhy PAR and 5 Criteria March, 1994 DOC: IEEE P802.11-94/xxx April, 2002 IEEE P802.15-02/103r2 IEEE P802.15 Wireless Personal Area Networks Project IEEE P802.15 Working Group for Wirele
https://grouper.ieee.org/groups/802/3/10G_study/email/msg00293.html
RE: Wide Area Networking for the Rest of US - the debate on BER and oth Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index RE: Wide Area Networking for the Res
https://grouper.ieee.org/groups/802/3/cd/public/Mar17/minutes_3cd_0317_approved.pdf
Microsoft Word - minutes_3cd_0317_approved.docx 1 Approved Minutes IEEE P802.3cd 50 Gb/s, 100 Gb/s, 200 Gb/s Ethernet Task Force Plenary Meeting March 13-14, 2017 Vancouver, BC, Canada Prepared by Ken
https://grouper.ieee.org/groups/802/secmail/doc00276.doc
IEEE-SA Standards Board Project Authorization Request (PAR) Form (2002) IEEE-SA Standards Board Project Authorization Request (PAR) Form (2004) The submittal deadlines for the Year 2004 are available.
https://grouper.ieee.org/groups/802/3/dj/public/23_11/welch_3dj_01b_2311.pdf
200G/L Technical Feasibility 200G/L Technical Feasibility Brian Welch (Cisco) Vasu Parthasarathy (Broadcom) IEEE P802.3dj 200 Gb/s, 400 Gb/s, 800 Gb/s, and 1.6 Tb/s Ethernet Task Force 1 Contributors
https://grouper.ieee.org/groups/802/3/ch/comments/P8023ch_D2p2_comments_by_Comment_ID_proposed_responses.pdf
MainTable D2.2 Physical Layer Specifications and Management Parameters for 2.5 Gb/s, 5 Gb/s, and 10 Gb/s Autom P802.3ch D2.2 Proposed Response # 1Cl 45 SC 45.2.1.195.3 P 39 L 50 Comment Type T The Pre