IEEE P802.3ck D3.1 1st Sponsor recirculation ballot comments # R1-14Cl FM SC FM P 1 L 28 Comment Type E This list is not correct. It also lists five previous amendments yet P802.3cx is identified as A
untitled IEEE P802.3ap Comments 3/14/2005 # 120Cl 01 SC 1.4 P 1 L 1 Comment Type TR Add definition of terms introduced in Backplane Ethernet to subclause 1.4. Suggested Remedy Create a section to hold
-- EDITOR'S NOTE: It is expected that the IF-CAP-STACK-MIB module will be deleted during the -- IEEE 802 LMSC sponsor ballot on this revision. It will be replaced with a pointer to an IETF RFC -- that
November, 1994 I. INTRODUCTION SPECIES EXTINCTION? JIM LOVEITE ApPLE COMPUTER, INC. NOVEMBER 8,1994 DOC: IEEE P802.11-94/294 This is the Law of the Yukon, that only the strong shall thrive; That surel
Microsoft Word - Patent_Policy_FAQ_111114_redline_to_current.pdf.docx Understanding Patent Issues During IEEE Standards Development IEEE Standards Association | 445 Hoes Lane | Piscataway NJ 08854 USA
July 2003 Welborn, XtremeSpectrum, Inc.Slide 1 doc.: IEEE 802.15-03/153r9 Submission Project: IEEE P802.15 Working Group for Wireless Personal Area NProject: IEEE P802.15 Working Group for Wireless Pe
IEEE P802.3cd 50 Gb/s, 100 Gb/s, 200 Gb/s Ethernet 1st Sponsor recirculation ballot comments # r01-16Cl 000 SC 0 P L Comment Type E The numbering of some of the references to definitions in the draft
IEEE P802.3bq D3.0 25G/40GBASE-T Ethernet Initial Sponsor ballot comments # i-138Cl 0 SC 0 P L Comment Type GR in bz in the alin clause there is a sentence that the calculation is done up tp 100 and 2
MINUTES (Unconfirmed) IEEE 802 LMSC EXECUTIVE COMMITTEE MEETING, Revision 3 Friday, July 22, 2011 – 1:00 p.m. All times Pacific Daylight Time (PDT) San Francisco, California EC members present: Pau
IEEE P802.3ck D2.2 100/200/400 Gb/s Electrical Interfaces Task Force 2nd Working Group recirculation ballot comments Proposed Response # 1Cl 00 SC 0 P 0 L 0 Comment Type E Keep 802.3ck aligned with th
IEEE P802.3bq D3.0 25G/40GBASE-T Ethernet Initial Sponsor ballot comments # i-138Cl 0 SC 0 P L Comment Type GR in bz in the alin clause there is a sentence that the calculation is done up tp 100 and 2
Final responses to comments against Draft 2.2 (sorted by comment ID) IEEE P802.3ap D2.2 BackPlane Commentsap Draft 2.2 Response # 1Cl 45 SC 45.2.7.100 P 47 L 1 Comment Type E Correct editors comment a
MainTable IEEE P802.3 (IEEE 802.3cj) D2.0 Maintenance #12 (Revision) Initial Working Group ballot comments # 23Cl 00 SC 0 P L Comment Type E http://www.ieee802.org/3/WG_tools/editorial/requirements/wo
IEEE P802.3bt D1.7 4-Pair Power-over-Ethernet 10th Task Force review comments 2Cl 00 SC 0 P L Comment Type ER Not all changes in the draft have an associated editing instruction SuggestedRemedy Go thr
IEEE P802.3ck D2.2 100/200/400 Gb/s Electrical Interfaces Task Force 2nd Working Group recirculation ballot comments # 1Cl 00 SC 0 P 0 L 0 Comment Type E Keep 802.3ck aligned with the new revision 802
IEEE P802.3bq D3.0 25G/40GBASE-T Ethernet Initial Sponsor ballot comments Response # i-1Cl 28 SC 28.3.1 P 27 L 8 Comment Type E In the editing instruction "the first list" should be "in the first list
Final responses to comments against Draft 2.2 (sorted by clause, page, line) IEEE P802.3ap D2.2 BackPlane Commentsap Draft 2.2 # 185Cl 00 SC P L Comment Type ER Some of my D2.0 comments are marked as
IEEE P802.3bq D3.0 25G/40GBASE-T Ethernet Initial Sponsor ballot comments Response # i-1Cl 28 SC 28.3.1 P 27 L 8 Comment Type E In the editing instruction "the first list" should be "in the first list