Re: [STDS-802-11-TGBE] Guidelines for Comment Assignments for TGbe CC36 Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: [STDS-802-11-TGBE] Guidelines fo
[STDS-802-16] IEEE 802.16m Requirement Draft Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index [STDS-802-16] IEEE 802.16m Requirement Draft To : STDS-802-16@l
IEEE 802.3 400GSG group mail archive IEEE 802.3 400GSG group email archive Date Index (Page 4 of 31) Thread Index Search Tool First Page Prev Page Next Page Last Page [STDS-802-3-400G] May Interim Mee
Re: [802.3_100GNGOPTX] Minutes Uploaded - Forward Direction Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: [802.3_100GNGOPTX] Minutes Uploaded - Forwar
802.16 Session #42 Report IEEE 802.16 Session #42 Report Session #42 Venue IEEE 802.16's Session #42 took place on 6-9 March 2006 at the Hyatt Regency Denver at Colorado Convention Center in Denver, C
Re: [802SEC] 02/01/06 TENTATIVE TALLY UPDATE#2: 802.11n Press Release Em Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: [802SEC] 02/01/06 TENTATIVE TAL
MainTable IEEE P802.3ct D2.1 100 Gb/s over DWDM systems 1st Working Group recirculation ballot comments Proposed Response # 1Cl 1 SC 1.4.180a P23 L18 Comment Type E "channel spacing" comes after "Chan
Updated Considerations on 400Gb/s Ethernet SMF PMDs HUAWEI TECHNOLOGIES CO., LTD. Further information on PAM4 error performance and power budget considerations San Antonio, November 2014 Peter Stassar
Re: [802SEC] +++10 Day EC Ballot+++Request Number 2 for Document 18-13-0 Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: [802SEC] +++10 Day EC Ballot+++
Microsoft PowerPoint - 2014-11-exec-motions.ppt [Compatibility Mode] 802.1 Motions & supporting material Closing IEEE 802 EC November 2014, San Antonio 1 Agenda (1) PARs to NesCom – IEEE P802.1AS-re
[802.3_100G-OPTX] Invitation to participate in Standards Association Bal Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index [802.3_100G-OPTX] Invitation to par
November 1991 Objectives: Diffuse Infrared Conference Room Tests Roger Samdahl Photonics Corporation doc: IEEE P802.11-911124 Between late 1990 and mid 1991. Photonics perfonned a series of tests usin
Structure of the day IEEE 802 University outreach proposal D5.0 12 March 2012 1 Overview This IEEE 802 university outreach program would involve outreach to universities local to IEEE 802 plenary loca
Re: AW: Patch cord for 1300 WWDM Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: AW: Patch cord for 1300 WWDM To : stds-802-3-hssg@xxxxxxxx , Carsten.Sc
[802SEC] SuperShuttle is going out of business. Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index [802SEC] SuperShuttle is going out of business. To : STDS-80
Re: [802SEC] +++ 10-day EC Email Ballot +++ Approval of Liaison to 3GPP Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: [802SEC] +++ 10-day EC Email Bal
Microsoft PowerPoint - 2012_may_BER_requirement_final3d.pptx EPoC Study Group Considerations and Recommendations for EPoC Error Performance 15 May 2012 Tom Kolze Broadcom Corporation 2 Supporters . •
Re: [802SEC] +++ Second 10-day EC motion +++ Approval of submission for Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: [802SEC] +++ Second 10-day EC mo
Technical Feasibility of 40km SMF 100GE Transceivers Technical Feasibility of 40km SMF 100GE Transceivers IEEE 802.3 Higher Speed Study Group 17-19 January 2007 Chris Cole chris.cole@finisar.com 21717