IEEE 802.16 Session #29 Documents 802.16 Session #29 Documents Tools Commentary Working Group Documents All WG Documents WG Upload Directory Working Group Liaison Documents All Liaison Documents Passw
IEEE 802.16 Session #28 Documents 802.16 Session #28 Documents Tools Commentary Working Group Documents All WG Documents WG Upload Directory Working Group Liaison Documents All Liaison Documents Passw
1 AGENDA IEEE Canada Standards Committee 9-10 July 2002 Tweedsmuir Room, Conference Floor Fairmont Hotel Vancouver Vancouver, BC Canada 1. Welcome: Doug Topping 1a. New Member: C. Philip Choy (via tel
IEEE 802.3ah Ethernet in the First Mile Task Force IEEE 802.3ah Ethernet in the First Mile Task Force June, 2003, Ottawa Presentation Materials # Name Company/Organization Presentation Title 1 All Fil
Proposed New 802 Proposed New 802.20 Development Plan DRAFT FINALIZATION Resolution of Previous Letter Ballot Rejected Comments Jan 07 Call for Additional Proposals & draft changes Jan-07 All Proposal
Original Comment Form 802.11g LB50 Consolidated Comments Letter Ballot 50 Commenter Clause Comment Type (E or T) Part of No Vote? (Y or N) Comment / Explaination Recommended Change MAufer, Thomas 9.6
200G/lane PAM4: Error Profile and Error Propagation Considerations Part3 - Multi part links cases- FEC strategies and their solution space 200G/lane PAM4: Error Profile Error Propagation and Error Cor
PROJECT IEEE 802 Broadband Wireless Access Study Group DATE March 5, 1999 TITLE Functional Requirements for Broadband Wireless Access Networks SOURCE James F. MollenauerEnsemble Communications 37 Silv
Re: [802SEC] Why Buzz Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: [802SEC] Why Buzz To : STDS-802-SEC@LISTSERV.IEEE.ORG Subject : Re: [802SEC] Why B
System Requirements Assuring That Point-to-Multipoint Broadband Wireless Access Networks Are Agnostic to User and Network Protocols 1999-06-30 IEEE 802.16mc-99/01 Ð 1 Ð Project IEEE P802.16 Broadband
IEEE P802 IEEE P802.11Wireless LANs PROPOSAL FOR 5-GHz PHY Date: January 16, 1998 Author: John H. Cafarella MICRILOR, Inc. 17 Lakeside Office Park, Wakefield, MA 01880 Phone: 781-246-0103 Fax: 781:246
July 1996 DOC.: IEEE PB02.11-96/11 0 July '96 MAC group Report LLC I MAC I PHY IEEE 002.11 MAC report July l!1~6 MIe"""1 (. 111 .... 1 DAvo) FIs<;h" Goals for July '96 • One goal - Forward Draft to Ex
[STDS-802-11] TGbd Teleconference on Jun 12 Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index [STDS-802-11] TGbd Teleconference on Jun 12 To : STDS-802-11@xxx
Re: [STDS-802-11] 11me/D1.0 CID 1479 (Beacon frame size) Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: [STDS-802-11] 11me/D1.0 CID 1479 (Beacon frame
Re: [STDS-802-11] 11me/D1.0 CID 1479 (Beacon frame size) Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: [STDS-802-11] 11me/D1.0 CID 1479 (Beacon frame
IEEE 802.20 Contribution 2005-05-09 IEEE C802.20-04/24 2005-3-11 IEEE C802.20-04/72r4 Project IEEE 802.20 Working Group on Mobile Broadband Wireless Access < http://grouper.ieee.org/groups/802/20/ > T
[STDS-802-11-TGBD] TGbd Teleconference on Jun 12 Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index [STDS-802-11-TGBD] TGbd Teleconference on Jun 12 To : STDS-
Re: [8023-10GEPON] Define TDP values Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: [8023-10GEPON] Define TDP values To : STDS-802-3-10GEPON@xxxxxxxxxx