Minutes of the IEEE 802.3z Gigabit Ethernet Task Force ****************************************************** Vancouver, British Columbia, November 11-14, 1996 ****************************************
DR AF T 02 .2 P1788: IEEE STANDARD FOR INTERVAL ARITHMETIC VERSION 02.2 JOHN PRYCE, TECHNICAL EDITOR Contents 0. Overview 3 0.1. Scope 3 0.2. Purpose 3 0.3. Inclusions 3 0.4. Exclusions 3 0.5. Word us
comments Comment ID Date Comment # Name Email Phone Style Index # Classification Vote Affiliation Category Page Subclause Line Comment File Must Be Satisfied Proposed Change Resolution Status Resoluti
comments Comment ID Date Comment # Name Email Phone Style Index # Classification Vote Affiliation Category Page Subclause Line Comment File Must Be Satisfied Proposed Change Resolution Status Resoluti
DR AF T 7. 3 P1788/D7.3 Draft Standard For Interval Arithmetic John Pryce and Christian Keil, Technical Editors DR AF T 7. 3 DR AF T 7. 3 Frontmatter Required IEEE items to be added: – Draft copyright
Motion - FEC Limit consideration of FEC proposals to those based on khermosh_general_1_0702.pdf as further elaborated in khermosh_fec_1_0902.pdf and maislos_fec_2_0902.pdf. Mover: Jonathan Thatcher Se
IEEE 802.3ah EFM Task Force Photo Album - Seoul, Korea May-2003 IEEE 802.3ah EFM Task Force Photo Album Ottawa, Ontario, June 2003 zip archive of all pictures Photographs from Glen Kramer Back to EFM
IEEE 802.3 Ethernet Working Group Search Tool IEEE 802.3 Ethernet Working Group Search Tool Search: All IEEE 802.3 areas for: Tip: Search terms are stemmed. For example: network matches network
Microsoft PowerPoint - Presentation1 Power / IF Xtalk Measurements John D’Ambrosia Tyco Electronics July 9, 2004 Test Plan All data taken by UNH-IOL (THANKS GUYS!) Anonymous Test Platform (& connector
IEEE P802.3ak Task Force Public area IEEE P802.3ak 10GBASE-CX4 Comments on Draft D5.2 2nd Sponsor Ballot Recirculation All comments (19Kb) No Unresolved TR comments Change Summary for D5.2 to D5.3 (78
Motion - FEC Limit consideration of FEC proposals to those based on khermosh_general_1_0702.pdf as further elaborated in khermosh_fec_1_0902.pdf and maislos_fec_2_0902.pdf. Mover: Jonathan Thatcher Se
IEEE 802.3 Ethernet Working Group Search Tool IEEE 802.3 Ethernet Working Group Search Tool Search: All IEEE 802.3 areas for: Tip: Search terms are stemmed. For example: network matches network
minutes_1100.PDF Jeff Warren Date 12/21/00 Extreme Networks Page 1 of 64 IEEE P802.3ae November 2000 10 GbE Task Force Meeting IEEE P802.3ae – 10 Gigabit Ethernet Minutes Task Force Plenary Meeting No
Fixed Radio Systems; Point-to-Point and Point-to-Multipoint equipment; Rules for the co-existence of point-to-point and point-to-multipoint systems using different access methods in the same frequency
92636 Federal Communications Commission FCC 09-31 Before the Federal Communications Commission Washington, D.C. 20554 In the Matter of A National Broadband Plan for Our Future ) ) ) GN Docket No. 09-5
Re: [STDS-802-11-TGBH] Pre-association identification (was: [STDS-802-11 Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: [STDS-802-11-TGBH] Pre-associat
P1149.10 High Speed Test Access Port and Distribution Architecture CJ Clark, Intellitech IEEE P1149.10 High Speed Test Access Port and Distribution Architecture CJ Clark, Intellitech 2/24/2015 1 http:
March 1992 IEEE P802.11-92/27 A Method for Characterizing a Medium for the Purpose of Definining a RadioLAN Standard and for Assuring Conformance to that Standard Part I-Introduction by Lourens VanDer
P1149.10 High Speed Test Access Port and Distribution Architecture CJ Clark, Intellitech IEEE P1149.10 High Speed Test Access Port and Distribution Architecture CJ Clark, Intellitech 2/22/2016 1 http: