118058 results found. results are sorted by relevance
  176-200
https://grouper.ieee.org/rac/private/email/msg04761.html
Re: CID Clarification Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: CID Clarification To : ROBERT GROW < bobgrow@xxxxxxx > Subject : Re: CID Clarifica
https://grouper.ieee.org/groups/802/3/400GSG/public/13_09/holden_400_01_0913.pdf
Simulation Results for NRZ, ENRZ, & PAM-4 on 16-wire full-sized 400GE Backplanes Simulation results for NRZ, ENRZ & PAM-4 on 16-wire full-sized 400GE backplanes Brian Holden Kandou Bus, S.A. brian@kan
https://grouper.ieee.org/groups/802/3/cd/public/Nov16/zambell_3cd_01_1116.pdf
Slide 1 zambell_3cd_01_1116 IEEE P802.3cd 50 Gb/s, 100 Gb/s and 200 Gb/s Ethernet Task Force Backplane Measurements using Draft 1.0 COM Parameters Andy Zambell Signal Integrity Team November 9th & 10t
https://grouper.ieee.org/groups/802/secmail/pdf1UGriYZ3Wm.pdf
WG11 Review of Nov 2012 Proposed PARs Submission doc.: IEEE 22-12/0102r0 Nov 2012 Jon Rosdahl (CSR) Slide 1 802.22 Response to the Comments on the 802.22.1 PAR Date: 2012-11-13 Authors: Name Company A
https://grouper.ieee.org/groups/802/3/25GSG/email/msg00359.html
Re: [STDS-802-3-25G] Power Consumption of of 25G RS-FEC Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: [STDS-802-3-25G] Power Consumption of of 25G RS-
https://grouper.ieee.org/groups/802/3/ISAAC/public/012224/zimmerman_3ISAAC_01b_012224.pdf
PAR Scope and Physical Layer Rates between 10 Gbps and 25 Gbps PAR Scope and Physical Layer Rates between 10 Gbps and 25 Gbps G EO RGE Z I M M ER M AN , P H . D. C M E CO N S U LT I N G /A D I , A P L
https://grouper.ieee.org/groups/802/secmail/msg25762.html
Re: [802SEC] Using the existing 'deadbeat policy' for virtual meeting fe Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: [802SEC] Using the existing 'de
https://grouper.ieee.org/groups/802/3/power_study/email/msg00724.html
RE: [802.3af] RE-SEND: Coments to the Register proposals for IEEE 802.3a Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index RE: [802.3af] RE-SEND: Coments to t
https://grouper.ieee.org/groups/802/11/email/stds-802-11-tgbe/msg08186.html
[STDS-802-11-TGBE] PoC assignment as of the end of Day 2 of the MAC ad-h Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index [STDS-802-11-TGBE] PoC assignment a
https://grouper.ieee.org/groups/802/secmail/doc00419.doc
Statement of Work Confidential - Draft Page 1 3/10/2005 Confidential - Draft 3/10/2005 Statement of Work for Revision of IEEE Project 802 LMSC Policies & Procedures 1 Background The IEEE Project 802 L
https://grouper.ieee.org/groups/802/11/email/stds-802-11/msg02656.html
[STDS-802-11] Fwd: FW: [STDS-802-11] Fwd: Incheon to Daejeon by bus Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index [STDS-802-11] Fwd: FW: [STDS-802-11] Fwd
https://grouper.ieee.org/groups/802/11/email/stds-802-11-tgm/msg02512.html
Re: [STDS-802-11-TGM] GEN AdHoc - CID 183 (also 184 and 563) - peer-to-p Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: [STDS-802-11-TGM] GEN AdHoc - C
https://grouper.ieee.org/groups/802/3/10G_study/email/msg00035.html
RE: WWDM vs. 10Gb/s serial Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index RE: WWDM vs. 10Gb/s serial To : bgregory@xxxxxxxxx, "'BRIAN_LEMOFF@xxxxxxxxxxxxxx
https://grouper.ieee.org/groups/802/3/10G_study/email/msg02089.html
Re: OFC revived; 2.5 Gbit Ethernet Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: OFC revived; 2.5 Gbit Ethernet To : stds-802-3-hssg@xxxxxxxx Subject
https://grouper.ieee.org/groups/802/3/minutes/nov13/NGEPON_icaid_form_v1_94.pdf
Next Generation Ethernet Passive Optical Network (NG-EPON) Industry Connections Activity Initiation Document (ICAID) Version: 1.94, 14 November 2013 Instructions • Instructions on how to fill out this
https://grouper.ieee.org/groups/802/3/bq/public/may15/cibula_3bq_01_0515.pdf
Rx CMNR ad hoc report - May 2015 Page 1 IEEE P802.3bq 40GBASE-T Task Force – May 2015 Interim Meeting, Pittsburgh, PA USA Receiver Common-Mode Noise Rejection ad hoc report IEEE P802.3bq 40GBASE-T Tas
https://grouper.ieee.org/groups/802/11/email/stds-802-11-tgbh/msg00510.html
Re: [STDS-802-11-TGBH] Minimum length (and optionality) of Device ID Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: [STDS-802-11-TGBH] Minimum length (
https://grouper.ieee.org/groups/802/3/bs/public/14_11/gustlin_3bs_03a_1114.pdf
400GbE PCS Options 802.3bj FEC Overview and Status DRAFT IEEE P802.3bs 400 Gb/s Ethernet Task Force November 2014 San Antonio Mark Gustlin – Xilinx Gary Nicholl – Cisco Dave Ofelt – Juniper Steve Trow
https://grouper.ieee.org/groups/802/11/email/stds-802-11-tgbe/msg01395.html
Re: [STDS-802-11-TGBE] Clarifications on QoS management contribution (41 Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: [STDS-802-11-TGBE] Clarificatio
https://grouper.ieee.org/groups/1788/email/msg08977.html
Re: Can you solve this interval problem using IEEE-stds 1788 Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index Re: Can you solve this interval problem using I
https://grouper.ieee.org/groups/802/3/minutes/mar21/0321_802_3_opening_plenary.pdf
IEEE 802.3 Ethernet Working Group IEEE 802.3 Working Group Opening Plenary – March 2021 Page 1Version 1.1 IEEE 802.3 Working Group Opening Plenary 8th March 2021 David Law Chair, IEEE 802.3 Working Gr
https://grouper.ieee.org/groups/802/11/Documents/DocumentArchives/1999_docs/90197A-An-Improved-Rate-Signalling-Scheme.doc
doc.: IEEE 802.11-99/019 January 1999 doc.: IEEE 802.11-99/019 IEEE P802.11 Wireless LANs An Improved Rate Signalling Scheme Date: January 10, 1999 Author: Tal Kaitz and Naftali Chayat BreezeCom Atiti
https://grouper.ieee.org/groups/802/3/ISAAC/public/1123/20231114_On_the_need_for_25Gbps_updated_post_presentation.pdf
PowerPoint Presentation Need for scalability beyond 10 Gbps Contribution to the ISAAC Study Group Janik Steyer-Ege (Bosch), Thomas Hogenmüller (Bosch), Felix Fellhauer (Bosch), Ragnar Jonsson (Marvell
https://grouper.ieee.org/groups/802/11/email/stds-802-11-tgbe/msg04735.html
[STDS-802-11-TGBE] 答复: [STDS-802-11-TGBE] 答: [STDS-802-11-TGBE] TGbe Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index [STDS-802-11-TGBE] 答复: [STDS-802-11-TGB
https://grouper.ieee.org/groups/802/3/25GSG/email/msg00039.html
[STDS-802-3-25G] 25G CR objective wording Thread Links Date Links Thread Prev Thread Next Thread Index Date Prev Date Next Date Index [STDS-802-3-25G] 25G CR objective wording To : STDS-802-3-25G@xxxx