118055 results found. results are sorted by relevance
1-25
https://grouper.ieee.org/groups/802/3/cw/comments/D2p1/8023cw_D2p1_comments_received_by_clause.pdf
MainTable IEEE P802.3cw D2.1 400 Gb/s over DWDM systems 1st Working Group recirculation ballot comments # 231Cl FM SC FM P 10 L 16 Comment Type E "physical layer" should be capitalized SuggestedRemedy
https://grouper.ieee.org/groups/802/3/cd/comments/8023cd_D12_comment_proposed_responses_by_clause.pdf
IEEE P802.3cd 50 Gb/s, 100 Gb/s, 200 Gb/s Ethernet 3rd Task Force review comments # 10Cl FM SC FM P 1 L 31 Comment Type E IEEE Std 802.3bu-2016 and IEEE Std 802.3bv-201x are missing from the list of a
https://grouper.ieee.org/groups/802/minutes/mar2008/Minutes%20-%20Friday%2020080321.pdf
Microsoft Word - Minutes - Friday 20080321.doc LMSC Minutes 3/21/2007 Page 1 AGENDA & MINUTES (Unconfirmed) - IEEE 802 LMSC EXECUTIVE COMMITTEE MEETING Friday March 21, 2008 1:00 PM – 6:00 PM Orlando,
https://grouper.ieee.org/groups/802/3/bq/comments/p802.3bq_d2.0_proposed_EZ_Bucket.pdf
IEEE P802.3bq D2.0 Physical Layer and Management Parameters for 40Gb/s Operation, Type 40GBASE-T Initial Working Group ballot comments 106Cl 113 SC 113.4.2.5 P 134 L 26 Comment Type TR Figure 113-26 L
https://grouper.ieee.org/groups/802/3/cg/comments/802.3cg_draft3p1_EndofMtg_Resolved_By%20Comment%20ID.pdf
MainTable IEEE P802.3cg D3.1 Physical Layer Specifications and Management Parameters for 10 Mb/s Operation and Associated Power Delivery over a Single Balanced Pair of Conductors 1st Sponsor recircula
https://grouper.ieee.org/groups/802/3/cd/comments/8023cd_D12_final_comment_responses_by_ID.pdf
IEEE P802.3cd 50 Gb/s, 100 Gb/s, 200 Gb/s Ethernet 3rd Task Force review comments Response # 1Cl 136 SC 136.9.4.2 P 216 L 1 Comment Type T Separate interference tolerance (noise stress) and jitter tol
https://grouper.ieee.org/groups/802/3/efm/public/comments/d1_4/D1_414_comments_043003.pdf
MainTable P802.3ah Draft 1.414 Comments # 406Cl 00 SC P L Comment Type T There has been a request for a discussion on Frame Based Testing to support the test structures of Clauses 58, 59 and 60. As th
https://grouper.ieee.org/groups/802/3/dj/comments/D1p0/8023dj_D1p0_comments_rx_clause.pdf
Received Comments D1.0 - By Clause IEEE P802.3dj D1.0 200 Gb/s, 400 Gb/s, 800 Gb/s, and 1.6 Tb/s Ethernet 1st Task Force review comments # 581Cl 00 SC 0 P0 L0 Comment Type T In the past, we have inclu
https://grouper.ieee.org/groups/802/3/dj/comments/D1p0/8023dj_D1p0_comments_rx_id.pdf
Received Comments D1.0 - By ID IEEE P802.3dj D1.0 200 Gb/s, 400 Gb/s, 800 Gb/s, and 1.6 Tb/s Ethernet 1st Task Force review comments Proposed Response # 1Cl 180 SC 180.8.5 P364 L23 Comment Type T 121.
https://grouper.ieee.org/groups/802/3/av/public/2008_03/3av_0803_comments_d1_1_proposed.pdf
MainTable IEEE 802.3av D1.1 10G EPON comments IEEE 802.3av Draft 1.1 Initial Comments Input # 825Cl 00 SC 0 P L Comment Type TR There should be test vectors for the RS(255, 223) code SuggestedRemedy I
https://grouper.ieee.org/groups/802/3/br/Comments%20received%20on%20IEEE%20P802.3br%20drafts/p8023br-2-0-comment-prelim-dispostion-v1.pdf
MainTable IEEE P802.3br (D2.0) Interspersing Express Traffic Initial Working Group ballot comments # 388Cl SC P L Comment Type T SuggestedRemedy Comment Status X Response Status O NoName Proposed Resp
https://grouper.ieee.org/groups/802/minutes/2011-November/20111111-closing-minutes-v1.pdf
MINUTES (Unconfirmed) ­ IEEE 802 LMSC  EXECUTIVE COMMITTEE MEETING, Revision 1 Friday, November 11, 2011 – 1:00 p.m. All times Pacific Daylight Time (PDT) Atlanta, GA EC members present: Paul Nikolich
https://grouper.ieee.org/groups/802/3/z/public/minutes/San0197.txt
THIS TEXT HAS NOT YET BEEN REVIEWED FOR TECHNICAL OR EDITORIAL ACCURACY. Minutes of: P802.3z Gigabit Ethernet Task Force 27 - 29 Jan 1997 Hyatt Islandia San Diego, CA, USA Howard Frazier, Chair === Di
https://grouper.ieee.org/groups/802/minutes/2015_07/2015_0717_Close_Minutes_r0.pdf
IEEE 802 July 2015 Closing Meeting Minutes 1 | P a g e MINUTES (Unconfirmed) IEEE 802 LMSC EXECUTIVE COMMITTEE MEETING, Revision 0 Prepared by John D’Ambrosia, Recording Secretary Friday July 17, 2015
https://grouper.ieee.org/groups/802/3/bz/comments/802d3bz_D1p1_Topic_proposed.pdf
IEEE P802.3bz D1.1 2.5G/5GBASE-T 2nd Task Force review comments 34Cl 28 SC 28.3.2 P 27 L 26 Comment Type E Delete 40Gb/s strikeout text - align w/bq SuggestedRemedy see comment - relates to master com
https://grouper.ieee.org/groups/802/3/df/comments/D1p1/8023df_D1p1_comments_rx_clause_2.pdf
IEEE P802.3df D1.1 2nd Task Force review comments # 47Cl FM SC FM P 1 L 31 Comment Type E "adds MAC parameters, Physical Layers, and management parameters" but we talk about "the Physical Layer" like
https://grouper.ieee.org/groups/802/3/cg/comments/802.3cg_draft3p0_Eds%20Prop%20Resolutions_By%20Comment%20ID_Editorial_Only.pdf
MainTable IEEE P802.3cg D3.0 Physical Layer Specifications and Management Parameters for 10 Mb/s Operation and Associated Power Delivery over a Single Balanced Pair of Conductors Initial Sponsor ballo
https://grouper.ieee.org/groups/802/3/av/public/2009_01/3av_0901_comments_d2_2_accepted.pdf
MainTable IEEE 802.3av d2.2 10G-EPON comments IEEE 802.3av Draft 2.2 Final Responses # 2868Cl 00 SC 0 P L Comment Type E Confusing for abreviation: RS=Reconciliation Sublayer vs. RS=Reed-Solomon Sugge
https://grouper.ieee.org/groups/802/3/bt/comments/802d3bt_D3p3_Responses_CommentID.pdf
IEEE P802.3bt D3.3 4-Pair Power over Ethernet 3rd Sponsor recirculation ballot comments Proposed Response # r03-1Cl 0 SC 0 P L Comment Type E The base_year variable appears to be set correctly as 201x
https://grouper.ieee.org/groups/802/3/bz/comments/802d3bz_D1p1_Clause_proposed.pdf
IEEE P802.3bz D1.1 2.5G/5GBASE-T 2nd Task Force review comments # 100Cl 00 SC 0 P 1 L 1 Comment Type E Please provide the option of using the new comment spreadsheet at the URL
https://grouper.ieee.org/groups/802/3/by/public/comments/8023by_D21_comments_received_by_ID.pdf
IEEE 802.3by D2.1 25 Gb/s Ethernet 1st Working Group recirculation ballot comments Proposed Response # 1Cl 108 SC 5.2.4 P 106 L 15 Comment Type T CL 108.5.2.4 In 802.3bj, CL 91.5.3.7 (AM mapping and i
https://grouper.ieee.org/groups/802/3/bt/comments/802d3bt_D3p3_Responses_DraftOrder.pdf
IEEE P802.3bt D3.3 4-Pair Power over Ethernet 3rd Sponsor recirculation ballot comments r03-1Cl 0 SC 0 P L Comment Type E The base_year variable appears to be set correctly as 201x in the front matter
https://grouper.ieee.org/groups/802/3/df/comments/D1p1/8023df_D1p1_comments_rx_id_2.pdf
IEEE P802.3df D1.1 2nd Task Force review comments Proposed Response # 1Cl 124 SC 124.8.5 P 107 L 1 Comment Type TR The text in the last bullet under 124.8.5 "The 400GBASE-DR4-2 or 800GBASE-DR8-2 trans
https://grouper.ieee.org/groups/802/3/by/public/comments/8023by_D21_comment_received_by_clause.pdf
IEEE 802.3by D2.1 25 Gb/s Ethernet 1st Working Group recirculation ballot comments # 88Cl FM SC FM P 11 L 17 Comment Type E One would reasonably assume that "the existing base standard and its amendme
https://grouper.ieee.org/groups/802/minutes/nov2005/Minutes%20-%20Monday%20November%2014%202005.pdf
LMSC SEC minutes IEEE 802 LMSC EC 11/14/2005 Page 1 5 10 15 20 25 AGENDA & MINUTES (Unconfirmed) - IEEE 802 LMSC EXECUTIVE COMMITTEE MEETING Monday, November 14, 2005 – 8:00 a.m. Vancouver, B.C., Cana